INSTALLATION
3.
Installation
3.1.
Installing the control unit
• Disconnect from the mains <41> and open the housing,
to do this loosen the two screws <34> (turn anticlockwise)
and open the housing cover.
• Note: Use the drilling template/included.
• Mount the housing in the designated spot, using both
attachment possibilities to do this. A drilling template
is included in the scope of delivery.
• Close the housing cover and tighten both screws
<34> (turn clockwise).
3.2.
Connecting the wastewater pump(s)
Connect the wastewater pump(s), to do this connect
the cable plug for the pump <40> as shown in Fig. [7].
Tighten the nut using 3 Nm. The gap <35> between
nut and plug-type connection is then 3-4 mm
(See Fig. [8])
The pump cable can be lengthened or shortened.
Refer to section 5.1 Shortening or lengthening the
pump/probe connection cable
34
[5]
40
Ecolift
[6]
35
[7]
[8]
Содержание Control Unit Ecolift 230V
Страница 19: ...19 120 2016 02 KONFORMIT TSERKL RUNG 7 Konformit tserkl rung...
Страница 39: ...39 120 2016 02 DECLARATION OF CONFORMITY 7 Declaration of conformity...
Страница 59: ...59 120 2016 02 D CLARATION DE CONFORMIT...
Страница 79: ...79 120 2016 02 DICHIARAZIONE DI CONFORMIT 7 Dichiarazione di conformit...
Страница 99: ...99 120 2016 02 CONFORMITEITSVERKLARING 7 Conformiteitsverklaring...
Страница 119: ...119 120 2016 02 DEKLARACJA ZGODNO CI 7 Deklaracja zgodno ci...