INSTRUCTIONS FOR INSTALLATION, OPERATION AND MAINTENANCE
KESSEL Backwater Lifting Station Ecolift XL
Status 2015/03
Part no. 010-694
Installation Commissioning Instructional briefing
for the system was carried out by your specialist company:
Name/signature
Date
City
For wastewater with and
without sewage
Reduction of pump
running times by using the
sewer gradient
Optionally available
with sealing flange for
installation in waterproof
concrete
Control unit with self-
diagnosis system and
battery buffering
USB interface for reading
out the log book
Product advantages
Stamp of specialist company
Subject to technical modifications
Содержание 010-694
Страница 42: ...42 264 Leistungserkl rung DOP 03 2015 9 Leistungserkl rung DOP...
Страница 43: ...Leistungserkl rung DOP 43 264 03 2015...
Страница 86: ...86 264 Declaration of conformity 03 2015 9 Declaration of conformity...
Страница 87: ...Declaration of conformity 87 264 03 2015...
Страница 129: ...D claration de conformit 129 264 03 2015 9 D claration de conformit...
Страница 130: ...130 264 03 2015...
Страница 131: ...131 264 03 2015...
Страница 173: ...Dichiarazione di conformit 173 264 03 2015 9 Dichiarazione di conformit...
Страница 174: ...174 264 Dichiarazione di conformit 03 2015...
Страница 175: ...175 264 03 2015...
Страница 218: ...218 264 Conformiteitsverklaring 03 2015 9 Conformiteitsverklaring...
Страница 219: ...Conformiteitsverklaring 219 44 03 2015...
Страница 261: ...Dane techniczne 261 264 03 2015...
Страница 262: ...262 264 Deklaracja zgodno ci 03 2015 9 Deklaracja zgodno ci...
Страница 263: ...Deklaracja zgodno ci 263 264 03 2015...