
UBS Hydro II
Operation
EN
2018-05-02
35 / 60
Fig. 10: Operating Unit
1
Drive lever
2
Drive lever
3
Ignition key
4
Auxiliary drive
5
Gas handle
6
Engine switch
To switch off the engine, carry out the following steps:
•
Before switching off the engine, make sure that the drive levers (1 and 2) are
in horizontal position an
d the lever of the auxiliary drive (4) is in its “Off”
position.
•
Put the gas handle (5) in neutral position and leave the engine running at
idle for approx. half a minute.
•
Set the engine switch (6) on the engine in its „O" position.
•
Close the fuel valve
•
Secure the one-axle tractor against unauthorised usage and pull out the
ignition key (3) if necessary.
•
When leaving the machine, secure it against rolling away by placing wheel
chocks or, if necessary, by activating the locking brake.
For longer s
tandstill periods of the engine, do not switch off the “Engine-Off switch”
but close the fuel valve and leave the engine running until it automatically comes to
a standstill. With this, the gasifier is empty and it cannot become resinous.