UBS Hydro II
Transport, Packaging and storage
EN
2018-05-02
24 / 60
4
Transport, Packaging and storage
Mounting, installation and initial commissioning are done only by the employees of
the seller or by a person authorised by it.
Still, it can happen that during the installation and further use, the operators or
maintenance staff of the operator are assigned the task of handling the packages.
In doing so, the instructions given below must be followed.
4.1
Safety instructions
Please strictly observe all safety instructions listed in the chapter Safety!
(See chapter 2 Safety on page 7)
4.2
Transport inspection
Upon receiving, immediately check the delivery for completeness and transport
damages.
Proceed as follows if transport damages can be seen from outside:
•
Do not accept the delivery or accept it only conditionally.
•
Note the extent of damages in the transport documents or on the delivery
slip of the transporter.
•
Initiate claim.
Claim each defect as soon as it is detected. Indemnity claims can be asserted only
within the applicable claim periods.
4.3
Packaging
Handling the packaging materials
Dispose of the packaging material must be according to the respectively applicable
legal regulations and guidelines.
NOTE
Environmental damage caused by incorrect waste disposal!
Packaging materials are valuable raw materials and can be reused in many
cases or prepared and recycled. An incorrect disposal of the packaging materials
can result in environmental damage.
•
Dispose of packaging materials in an environment-friendly manner.
•
Follow the locally applicable disposal guidelines. If applicable, assign the
disposal to a specialist company.