2018-12-18
44 / 74
Front sweeper FKM 60
Assembly / installation, installation, commissioning
ENG
Fig. 17: Coupling and uncoupling of the front sweeper
1
Clearance
Coupling
The following points should be observed when coupling the attachment:
1.
Hook the attachment frame of the sweeper into the front hydraulics or into
the interchangeable holder of the carrier vehicle.
2.
Align the mounting frame perpendicular to the ground.
3.
Align the front sweeping machine so that the base housing is parallel to the
ground.
4.
Couple the mounting frame to the front sweeper. Make sure that the bolts
have clearance (1) in both directions.
5.
If necessary, plug the electrical connection into the 3-pin socket of the
carrier vehicle.
Uncouple
Uncoupling is done in the reverse order.
Содержание FKM 60
Страница 74: ...2018 12 18 74 74 ENG...