2018-12-18
63 / 74
Front sweeper FKM 60
Maintenance
ENG
7.3.4 Check safety features
Staff:
•
Operators
Protective gear:
•
Protective clothing
•
Protective gloves
The planning, execution and documentation of tests must be carried out in
consideration of the valid regulations and laws by the operator.
To ensure safe operation of the machine, the safety devices must be checked:
Separating guards (covers)
interval
During commissioning, when switching on the machine
scope
Visual inspection for integrity
tester
operator
Measures for
errors
•
Lock the danger area
•
Repair
7.4 Measures after maintenance
Staff:
•
Private and commercial operators
After completing the maintenance and before turning on the machine, perform the
following steps:
1.
Check all previously loosened screw connections for tightness.
2.
Verify that all previously removed guards and covers are properly
reinstalled.
3.
Make sure all tools, materials and other equipment used have been
removed from the work area.
4.
Clean work area and any leaked substances such. As liquids, processing
material or the like remove.
5.
Make sure that all safety devices of the machine are working properly.
Содержание FKM 60
Страница 74: ...2018 12 18 74 74 ENG...