![KERN GAB 15K5DM Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/kern/gab-15k5dm/gab-15k5dm_service-manual_1957262025.webp)
-
25
- GAB/GAS-SH-e-0711
4.2 Assembly Procedure (Large Size: 15kg
•
30kg)
4.2.1 Base
Replacement
The seal restricts the peel according to the country by a no report and doing as wanting
put it.
Do the procedure in a pertinent country.
Disassembly procedure
1. Remove two dry batteries when using the batteries. Remove the AC adaptor when using the
AC adaptor.
2. Remove the four foot levels.
3. Peel off the approval seal.
4. Remove the four M4×10 screws.
5. Lift the base, and pull out the battery harness from CN2 of the main board PS-005.
Assembly procedure
1. Do in the reverse order for assembly.
2. The material of approval seal is void seal. It is not possible to use it again. Put a new approval
seal.
KERN
Содержание GAB 15K5DM
Страница 5: ...5 GAB GAS SH e 0711 1 3 Appearance Front view Rear view Bottom view...
Страница 7: ...7 GAB GAS SH e 0711 1 5 Outer Dimensions Small size Large size...
Страница 15: ...15 GAB GAS SH e 0711 Chapter 3 Hardware Configuration 3 1 Mechanisms 3 1 1 Small Size 3kg 6kg...
Страница 17: ...17 GAB GAS SH e 0711 3 1 2 Large Size 15kg 30kg...
Страница 28: ...28 GAB GAS SH e 0711 7 Start the test mode and perform the C3 mode span adjustment...