![KERN GAB 15K5DM Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/kern/gab-15k5dm/gab-15k5dm_service-manual_1957262021.webp)
-
21
- GAB/GAS-SH-e-0711
Chapter 4 Maintenance
4.1 Disassembly Procedure (Small Size: 3kg
•
6kg)
The seal restricts the peel according to the country by a no report and doing as wanting
put it. Follow the relevant procedure for the respective countries.
4.1.1 Base
Replacement
Disassembly procedure
1. Remove dry batteries when using batteries. Remove the AC adaptor when using the AC
adaptor.
2. Remove four foot levels.
3. Peel off the approval seal.
4. Remove the four M4×10 screws.
5. Lift the base, and pull out the battery harness from CN2 of main board PS-005.
Assembly procedure
1. Perform in reverse order to disassembly.
2. The approval seal material is a void seal. It is not possible to use it again. Use a new approval
seal.
KERN
Содержание GAB 15K5DM
Страница 5: ...5 GAB GAS SH e 0711 1 3 Appearance Front view Rear view Bottom view...
Страница 7: ...7 GAB GAS SH e 0711 1 5 Outer Dimensions Small size Large size...
Страница 15: ...15 GAB GAS SH e 0711 Chapter 3 Hardware Configuration 3 1 Mechanisms 3 1 1 Small Size 3kg 6kg...
Страница 17: ...17 GAB GAS SH e 0711 3 1 2 Large Size 15kg 30kg...
Страница 28: ...28 GAB GAS SH e 0711 7 Start the test mode and perform the C3 mode span adjustment...