![KERN GAB 15K5DM Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/kern/gab-15k5dm/gab-15k5dm_service-manual_1957262023.webp)
-
23
- GAB/GAS-SH-e-0711
4.1.3 Load
Cell
Replacement
1. Remove the load cell cable and ground cable by using the soldering iron.
2. Remove the ST4×10 screw which fixes the cable clamp.
3. Remove the four M5×16 screws which fixe the plate support at four case locations.
4. Remove the case.
5. Remove the four ST4×14 screws which fix the plate support and platter.
Содержание GAB 15K5DM
Страница 5: ...5 GAB GAS SH e 0711 1 3 Appearance Front view Rear view Bottom view...
Страница 7: ...7 GAB GAS SH e 0711 1 5 Outer Dimensions Small size Large size...
Страница 15: ...15 GAB GAS SH e 0711 Chapter 3 Hardware Configuration 3 1 Mechanisms 3 1 1 Small Size 3kg 6kg...
Страница 17: ...17 GAB GAS SH e 0711 3 1 2 Large Size 15kg 30kg...
Страница 28: ...28 GAB GAS SH e 0711 7 Start the test mode and perform the C3 mode span adjustment...