background image

KEPCO, INC. 



 131-38 SANFORD AVENUE 



  FLUSHING, NY. 11355 U.S.A.



  TEL (718) 461-7000



 FAX (718) 767-1102



http://www.kepcopower.com   



 email: [email protected]

 022720

228-1921

7

4.3.  ADDITIONAL FEATURES. 

The following fea-

tures of the BOP 2X-DE power supply are covered in the
full BOP 2X-DE Operator Manual (see PAR. 1.1).

• BOP Channel Operation with Remote Control of 

the Voltage Control Channel

• BOP Channel Operation with Remote Control of 

the Current Control Channel

• Using a BOP Channel as an Amplifier

• Remote Control of a BOP Channel Current Limit

• Remote Control of a BOP Channel Voltage Limit

• Series and Parallel Connection of BOP Channels

• Remote On-Off Control.

The following additional features are covered in the BIT
802E Operator Manual (see PAR. 1.1)

• Programming an Output channel via the LAN 

interface.

• Calibration of an Output channel via the LAN 

interface.

FIGURE 8.  BOP 2X-DE SERIES REAR PANEL TERMINATIONS

Channel 2

Rear Panel

PC 15 

Programming 

Connector

Channel 2

D-C OUTPUT
terminal block

(DETAIL "A")

Channel 1

Rear Panel

PC 15 

Programming 

Connector

A-C Power

input 

connector

Channel 1

D-C OUTPUT
terminal block

(DETAIL "A")

3044414

Links (3)

P/N 172-0306

DETAIL "B"

DETAIL "A"

Channel 2

LAN Port

(DETAIL "B")

Channel 1

LAN Port

(DETAIL "B")

S OUT
OUT
GND
GND NET
COM
S COM

LAN RESET 

Switch

LAN 

Indicator

8

1

ETHERNET

Connector

Содержание BOP 2X-DE Series

Страница 1: ...olar limit circuits The positive and negative current or voltage limit points can be remotely programmed simultaneously or Individually Automatic crossover between each principal control loop and the...

Страница 2: ...INARY CHECKOUT A simple oper ating check after unpacking and before permanent instal lation is advisable to ascertain whether the BOP 2X DE has suffered damage in shipment 1 Install PC 15 programming...

Страница 3: ...work reduces noise ripple that may be present at the output when the output is not grounded INPUT A C CONNECTIONS Install the line cord sup plied at the rear panel and connect to 115V a c 60Hz 105V to...

Страница 4: ...to run the application A separate window opens as shown in Figure 5 Once the search is completed all found units are displayed in the Select a Unit window the MAC address appears in parentheses If you...

Страница 5: ...by default to a fixed value approximately 10 above the nominal output voltage and current of the unit Refer to the Operator s Manual see PAR 1 1 to use external reference signals in the 0 to 10V range...

Страница 6: ...nt 1 Refer to PAR 3 4 and connect the load to the DC OUTPUT Terminal Block for the channel in use 2 Perform steps 1 through 9 of the Preliminary Checkout see PAR 3 2 3 Click on the MODE button at the...

Страница 7: ...BOP Channel Voltage Limit Series and Parallel Connection of BOP Channels Remote On Off Control The following additional features are covered in the BIT 802E Operator Manual see PAR 1 1 Programming an...

Страница 8: ...8 228 1921 022720 KEPCO INC 131 38 SANFORD AVENUE FLUSHING NY 11355 U S A TEL 718 461 7000 FAX 718 767 1102 http www kepcopower com email hq kepcopower com...

Отзывы: