background image

KEPCO, INC. 



 131-38 SANFORD AVENUE 



  FLUSHING, NY. 11355 U.S.A.



  TEL (718) 461-7000



 FAX (718) 767-1102



http://www.kepcopower.com   



 email: [email protected]

 022720

228-1921

5

sure it is turned on and connected to the network, then click
the Search Again button.

FIGURE 5.  PS FIND SCREEN

3.7.  COOLING. 

The components in the BOP 2X-DE

power supply rely on forced air cooling. FRONT AND
REAR PANEL OPENINGS AND THE TOP OF THE CASE

MUST

 BE KEPT CLEAR FROM ALL OBSTRUCTIONS TO

ENSURE AIR CIRCULATION. Periodic cleaning of the
interior of the power supply is recommended. If the BOP
2X-DE is rack-mounted or installed into confined spaces,
care must be taken that the ambient temperature (the tem-
perature immediately surrounding the power supply) does
not rise above 55°C (~131°F).

IV — OPERATION     

Each BOP channel is controlled by commands issued
through web pages accessed through a web browser.

The following paragraphs provide simple procedures to
control a BOP channel output voltage (PAR. 1) or output
current (PAR. 4.2). Refer to the Operator’s Manual (see
PAR. 1.1) for alternative ways of controlling the BOP out-
put.

Voltage and current limits are set by default to a fixed value
approximately 10% above the nominal output voltage and
current of the unit. Refer to the Operator’s Manual (see
PAR. 1.1) to use external reference signals in the 0 to +10V
range to remotely program/control limits between 0.2% and
110% of nominal output,

4.1.  VOLTAGE MODE OPERATION WITH CUR-

RENT LIMITING.  

The BOP channel may be used as a

stabilized (d-c) source of positive or negative voltage with
output current limiting (for either polarity) when adapted for
the application at hand. 

Always monitor the front panel meters while adjusting out-
put voltage/current.

FIGURE 6.  REAR PROGRAMMING CONNECTOR, 

WIRING DIAGRAM

1. Refer to PAR. 3.4 and connect the load to the DC OUT-

PUT Terminal Block for the channel in use.

2. Perform steps 1 through 10 of the Preliminary Checkout

(see PAR. 3.2).

3. From the Operate Instrument page, click the Output

ON/OFF

 button at the upper right of the web page and

1

3

5

7

9

11

13

15

17

19

21

23

31

27

25

29

2

4

6

8

16

12

10

14

22

28

30

32

18

26

24

20

37

33

35

49

34

36

39

47

41

42

38

40

48

50

46

J1

1
2
3
4
5
6
7
8
9

10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

TP10

1

2

TP5

1

2

TP4

1

2

TP3

1

2

TP2

1

2

TP1

1

2

TP11

1

2

TP6

1

2

TP7

1

2

TP9

1

2

TP8

1

2

ISOLATED
CIRCUITS

PC 15
CONNECTOR

3021008

Содержание BOP 2X-DE Series

Страница 1: ...olar limit circuits The positive and negative current or voltage limit points can be remotely programmed simultaneously or Individually Automatic crossover between each principal control loop and the...

Страница 2: ...INARY CHECKOUT A simple oper ating check after unpacking and before permanent instal lation is advisable to ascertain whether the BOP 2X DE has suffered damage in shipment 1 Install PC 15 programming...

Страница 3: ...work reduces noise ripple that may be present at the output when the output is not grounded INPUT A C CONNECTIONS Install the line cord sup plied at the rear panel and connect to 115V a c 60Hz 105V to...

Страница 4: ...to run the application A separate window opens as shown in Figure 5 Once the search is completed all found units are displayed in the Select a Unit window the MAC address appears in parentheses If you...

Страница 5: ...by default to a fixed value approximately 10 above the nominal output voltage and current of the unit Refer to the Operator s Manual see PAR 1 1 to use external reference signals in the 0 to 10V range...

Страница 6: ...nt 1 Refer to PAR 3 4 and connect the load to the DC OUTPUT Terminal Block for the channel in use 2 Perform steps 1 through 9 of the Preliminary Checkout see PAR 3 2 3 Click on the MODE button at the...

Страница 7: ...BOP Channel Voltage Limit Series and Parallel Connection of BOP Channels Remote On Off Control The following additional features are covered in the BIT 802E Operator Manual see PAR 1 1 Programming an...

Страница 8: ...8 228 1921 022720 KEPCO INC 131 38 SANFORD AVENUE FLUSHING NY 11355 U S A TEL 718 461 7000 FAX 718 767 1102 http www kepcopower com email hq kepcopower com...

Отзывы: