3.2.4  MAINTENANCE

PRELIMINARY CHECKS BEFORE STARTUP

Pipeline system has been vacuumed before initial start the
 equipment (see Fig.3-14)

the unit is positioned correctly;

the flow and return pipes of the water system are correctly 
connected;

the pipes are clean and free of air;

the unit falls correctly towards the drainage outlet and the 
trap;

the heat-exchangers are clean;

the electrical connections are correct;

the screws holding the cables are well tightened;

the supply voltage is as required;

the power consumption of the blower is correct and does not 
exceed the maximum permitted.

Before starting up the unit,make sure that:

1    Remove the connecting pipe’s side cover panel by cross 

      screwdriver.  

2    Remove the bolts that showed at the figure by slotted screw

      driver. Start up the pump to circulate the pipeline water and 

      vacuum air from the system until there have water flow out 

      from bolt holes, and then  tighten the boltsthe system.    

3     Shutdown the sestem that showed at the figure by slotted 

      screwed and replace the side cover panel.

10

I&O manual

Fig.3-14

SCHEDULED MAINTENANCE

Once a month

Check the state of cleanliness of the air filters.
The air filters are made of fibre and are washable in 
water.The state of cleanliness of the filters must be 
checked regularly at the start of the operating season and 
on a monthly basis.

Every six months

Check the state of cleanliness of the heat-exchanger and 
the condensation drain-tube. With the unit switched 
off,remove the casing of the machine and check the state 
of the heat-exchanger and the condensation drain-tube.If 
necessary:

At the end of the season

Drain the water system(for all heat exchangers).

Electrical Circuit

The following operations are recommended for the 
maintenance of the electrical circuit:

remove any foreign bodies from the finned surface 
which may obstruct air flow;

clean off the dust with a jet of compressed air;

wash and brush,gently,with water;

dry with a jet of compressed air;

check that there are no obstructions in the 
condensation drain tube which could prevent the 
normal flow of water.

1

2

4

3

remove the casing of the machine (on units I );

start the system and run for a few minutes;

stop the system;

slacken the bleed screw on the inlet manifold and 
bleed the air.

Repeat the operation several times until no more air 
comes out of the system.

1

2

check the unit 's power absorption using a clip-on 
ammeter and compare the reading with the values 
shown on the documentation;

inspect and,if necessary, tighten the electrical 
contacts and terminals.

1

2

5

3

4

Remove the casing (on units I )

Disconnect the electrical supply cable from the 
blower;

Remove the screws on both sides which hold the 
blower to the structure of the unit;

Take out the blower.

1

2

3

4

Check for the presence of air in the water system.

To avoid the risk of rupture due to freezing, it is 
advisable to drain the water from the system atthe 
end of every season.

NON-SCHEDULED MAINTENANCE

Replacement of the blower assembly

In the case of burnout of the blower electric  
motor,it  is necessary to replace the entire blower
assembly.

Procedure for removal of the blower:

CAUTION

DANGER!

Maintenance work must only be carried out by qualified 
technicians authorised to work on air-conditioning and 
refrigeration systems. Use suitable work gloves.

Do not introduce pointed objects through the air intake grilles.

Always disconnect the unit from the mains power supply at 
the main isolator switch before carrying out maintenance 
work or checks.Make sure that no one accidentally supplies 
power to the machine, lock the main switch in the Off 
position.

Disconnect the power supply before cleaning and maintenance.
Use dry cloth to clean the unit.

Содержание KFHC12H0EN1

Страница 1: ...uture reference I N S T A L L A T I O N O P E R A T I O N M A N U A L FAN COIL UNITS MODELS R410A KFHC12H0EN1 KFHC20H0EN1 KFHC25H0EN1 KFHC30H0EN1 KFHC38H0EN1 KFHC48H0EN1 KFHC57H0EN1 KFHC65H0EN1 KFHC78...

Страница 2: ...ll cause the set to fall water leakage electrical shock and fire The appliance must be installed 2 3m above floor The appliance shall not be installed in the laundry Before obtaining access to termina...

Страница 3: ...may result in electric shocks Be sure to install an earth leakage breaker Failure to install an earth leakage breaker may result in electric shocks Connect the outdoor unit wires then connect the indo...

Страница 4: ...mal protection and condenser permanently in circuit Structure in galvanised sheet steel Condensation collection tray with natural drainage complete with anti condensation insulation Mesh filter in reg...

Страница 5: ...sonnel or malfunctions caused by the use of non original spare parts or accessories Start stop the unit Select between the three blower speeds Thermostat adjustment and maintenance of the desired ambi...

Страница 6: ...ove the filter in version I proceed as following indicated The air filter must be cleaned by blowing it out with compressed air or washing it in water Before refitting the filter make sure it is clean...

Страница 7: ...ccordance with current health and safety regulations both as regards the equipment used and as regards the procedure followed Before commencing moving operations check that the lifting apparatus has t...

Страница 8: ...connections are made with great care by specialised fitters IMPORTANT The water coils can be partially drained through the drain valves To drain them completely they should be blown out with an air je...

Страница 9: ...fies the performance of the unit Pay attention to the safety instructions regarding ethylene glycol which are printed on the container If the unit is not used during the winter period the water contai...

Страница 10: ...ion 2 5mm2 type H05RN F The installation of room and pipe temperature sensors Outside temperature controller Fig 3 13 Inside temperature controller Fig 3 12 1 Install the room temperature sensor 1 Dis...

Страница 11: ...the electrical circuit remove any foreign bodies from the finned surface which may obstruct air flow clean off the dust with a jet of compressed air wash and brush gently with water dry with a jet of...

Страница 12: ...s important to adhere scrupulously to the following procedures The unit should only be dismantled by a firm authorized for the disposal of scrap machinery The unit as a whole is composed of materials...

Страница 13: ...1200 1000 1000 800 800 B mm 1284 1284 1284 984 984 784 784 584 584 C mm 1200 1200 1200 900 900 700 700 500 500 D mm 1226 1226 1226 926 926 726 726 526 526 626 626 115 345 203 291 115 258 74 220 143 A...

Страница 14: ...0 750 550 550 B mm 1226 12 26 1226 926 926 726 726 526 526 C mm 1200 12 00 1200 900 900 700 700 500 500 D mm 1232 12 32 1232 932 932 732 732 532 532 212 A D 545 46 105 126 345 203 291 185 258 B A C 21...

Страница 15: ...ter side pressure drops kPa 10 1 14 2 9 5 10 3 24 6 11 4 9 5 12 1 16 5 9 3 13 5 8 6 20 8 10 1 9 5 11 7 Water flow rate L H 364 492 631 774 899 1071 1343 1589 Water side pressure drops kPa 9 5 197 18 3...