INBUILT FLUE INSTALLATION

Once zero clearance box and 600mm flue transition is in desired place. Plumb up and cut a 

260mm square penetration for the passage of the flue pipe and casing through the ceiling. If 

preferred there can be no ceiling in the framed enclosure. Cut an opening through the roof 

to position the outer casing through the roof and connect into flue starter transition. Support if 

necessary with metal bracing angle to suitable anchorage points.

Join the required number of 150mm flue pipes by inserting the swaged ends of the upper piece 

into the plain end of the lower piece. Drill and fix each length with three stainless rivets or self-

tapping screws. It is important that each 150mm flue pipe joint is sealed with commercially 

available flue sealing compound, including the joint between the fire spigot and the first length 

of flue pipe. 

Assemble as many 200mm inner flue casings together as manageable with swaged ends up, fix 

lengths together with 3 rivets or self-tapping screws and slide over 150mm flue pipe from the top 

down to sit in position onto 200mm section of flue transition atop the Zero clearance box. Add 

Minimum Installation Clearances (mm)

Model

Model No.

A

B

C*

D

E

F

G

H

I

Rata

KWF295-6938

25

500

300

200

840

59

2000

1200

160

Logfire II

KWF295-6937

25

500

300

200

840

59

2000

1200

160

Floor protector from front of fascia.

TABLE 2

Inbuilt Installation

Insert installation

FIG. 1

I

G

H

C*

F

A

Plan Elevation

Side Elevation

(Masonry Cavity)

(Timber Cavity)

        

4

Open the door of the fire and manoeuvre the fascia over the open door taking care not to 

scratch the paint on the door. Align holes in fascia with screw locater holes in outer cabinet. 

Close the fire door and secure fascia to fire outer cabinet with screws and washers supplied. 

Check that door is central in fascia opening and tighten screws once fascia is in the desired 

position.

Refit louvers by placing in position at a 45° angle into the louver opening. Place the first louver  

bar at the top behind the front of the fascia. Rotate louver into position and pull down to locate 

bottom pins in position.

Содержание Logfire II

Страница 1: ...ing this wood fire and we suggest that the Insurance Company covering building insurance be advised of the installation 3 Kent built in wood fires when installed according to these instructions comply...

Страница 2: ......

Страница 3: ...ATION MASONRY CONSTRUCTION Prepare the masonry fireplace to accept the selected insert wood fire and flue ensuring installation requirements for width depth and height measurements are acceptable for...

Страница 4: ...ds up fix lengths together with 3 rivets or self tapping screws and slide over 150mm flue pipe from the top down to sit in position onto 200mm section of flue transition atop the Zero clearance box Ad...

Страница 5: ...m flue casing pipe from the top down to sit in position onto the 250mm section of flue transition atop the Zero clearance box Add additional 250mm sections of flue as necessary to finish at the same h...

Страница 6: ...ant bolt location Door adjustment catch pin FIG 3 Install the selected Kent wood burner into the prepared fireplace Once in position and level fix the fire to the base of the fireplace enclosure with...

Страница 7: ...flue termination is in a good clear position Your installer should be able to give advice on the best flue termination position for your situation Problems associated with wind noise or draft are almo...

Страница 8: ...of 785mm wide and 640mm deep behind the face of the wall with an additional 360mm forward of the wall face to allow for the front clearance once installed Timber framing around the Inbuilt box must h...

Страница 9: ...age initial demonstrations on how to light and operate the fire to ensure the user can confidently operate the fire for safe and efficient performance FIREWOOD Modern clean burning wood fires are desi...

Страница 10: ...rly air tight a vent may need to be installed next to the wood fire to provide the air required Lack of air will lead to a wood fire that is hard to light and get going or in bad cases to smoke spilli...

Страница 11: ...reosote deposits the interval between inspections may be increased but the flue must always be inspected and cleaned at least once a year The flue should be swept by a professional chimney sweep to re...

Страница 12: ...atches occur or the paint is damaged by over firing or aggressive cleaning agents the appliance can easily be touched up by using stove paint Any rust or other stubborn marks that may appear can be cl...

Страница 13: ...the temperature exposure Ensure ember levels do not build up to high when reloading the fire with fuel Replacing air tubes 1 Remove bricks from both sides 2 Remove the pin from the end of the old tub...

Страница 14: ...Top rear view Rata Logfire II The baffle in your Kent wood fire is an important part of the appliance and helps ensure a clean efficient and controllable burn However baffles and Promat bricks are a...

Страница 15: ...ructions supplied will render this warranty void Your Kent wood fire must be installed in accordance with the manufacturers instructions and with the appropriate approved flue system Installation must...

Страница 16: ...t date of publication and are subject to change without notice Kent products are distributed by Aber Holdings Ltd T A Aber Living 17 Mainstreet Place Te Rapa Hamilton 3200 Free Phone 0800 161 161 Free...

Отзывы: