A
E
B
A
C*
A
D
INBUILT FLUE INSTALLATION
Once zero clearance box and 600mm flue transition is in desired place. Plumb up and cut a
260mm square penetration for the passage of the flue pipe and casing through the ceiling. If
preferred there can be no ceiling in the framed enclosure. Cut an opening through the roof
to position the outer casing through the roof and connect into flue starter transition. Support if
necessary with metal bracing angle to suitable anchorage points.
Join the required number of 150mm flue pipes by inserting the swaged ends of the upper piece
into the plain end of the lower piece. Drill and fix each length with three stainless rivets or self-
tapping screws. It is important that each 150mm flue pipe joint is sealed with commercially
available flue sealing compound, including the joint between the fire spigot and the first length
of flue pipe.
Assemble as many 200mm inner flue casings together as manageable with swaged ends up, fix
lengths together with 3 rivets or self-tapping screws and slide over 150mm flue pipe from the top
down to sit in position onto 200mm section of flue transition atop the Zero clearance box. Add
Minimum Installation Clearances (mm)
Model
Model No.
A
B
C*
D
E
F
G
H
I
Rata
KWF295-6938
25
500
300
200
840
59
2000
1200
160
Logfire II
KWF295-6937
25
500
300
200
840
59
2000
1200
160
*
Floor protector from front of fascia.
TABLE 2
Inbuilt Installation
Insert installation
FIG. 1
I
G
H
C*
F
A
Plan Elevation
Side Elevation
(Masonry Cavity)
(Timber Cavity)
4
Open the door of the fire and manoeuvre the fascia over the open door taking care not to
scratch the paint on the door. Align holes in fascia with screw locater holes in outer cabinet.
Close the fire door and secure fascia to fire outer cabinet with screws and washers supplied.
Check that door is central in fascia opening and tighten screws once fascia is in the desired
position.
Refit louvers by placing in position at a 45° angle into the louver opening. Place the first louver
bar at the top behind the front of the fascia. Rotate louver into position and pull down to locate
bottom pins in position.
Содержание Logfire II
Страница 2: ......