To Order Parts Call 1-888-702-5326 - https://monsterfloorequipmentparts.com
INSTRUCTIONS FOR USE
8
Blue 32
– 146 2301 000(1)2005-03
MAINTENANCE
The proper and safe machine operation is guaranteed by
careful and regular maintenance.
The following table sums up the scheduled maintenance
for the machine. The indicated periods can be subjected
to variations according to working conditions. These
variations must be defined by the person in charge of the
maintenance.
All periodic or extraordinary maintenance operations must
be performed by skilled personnel, or by an authorized
service center.
This manual describes only the easiest and most common
maintenance procedures.
SCHEDULED MAINTENANCE TABLE
(*): For the related procedure see “Service Manual”.
(1): Or before each start.
WARNING!
Maintenance operations are to be carried
out with the machine off, the ignition key
removed and (if required) the battery
disconnected.
Moreover, carefully read the instructions in
the Safety chapter.
NOTE:
For other maintenance procedures, see the
specific “Service Manual” that can be
consulted at the Kent Service Center.
Maintenance operation
On delivery
Every 10
hours
Every 50
hours
Every 100
hours
Every 200
hours
Every 400
hours
Battery liquid level check
z
z
(1)
Drive belt visual inspection: main broom
drive
z
z
(*)
Skirt height and operation check
z
z
Side and main broom height check
z
Dust filter cleaning and integrity check
z
(1)
Electric filter-shaker (optional) operation
check
z
(*)
Nut and screw tightening check
z
(*)
Drive belt tensioner adjustment
z
(*)
Drive belt replacement: main broom drive
z
(*)
Main electric motor carbon brushes check
or replacement
z
(*)
Hood opening switch operation check
z
(*)