
Shoebox Heat Pump Manual Version 9.4
Page 20 of 40
Sa
fe
ty
in
fo
rma
ti
o
n
G
en
er
al
p
ro
d
u
ct
in
fo
rma
ti
o
n
In
sta
lla
tio
n
In
sta
lla
tio
n
sch
ema
tics
In
sta
lla
tio
n
me
ch
an
ica
l
In
sta
lla
tio
n
ele
ctr
ica
l
Co
mmu
n
al
G
ro
u
n
d
Ar
ra
y
Co
mmi
ss
io
n
in
g
Fa
u
lt
Fin
d
in
g
Wa
rr
an
ty
He
at
P
u
mp
se
tti
n
gs
sh
ee
t
In
tr
o
d
u
ctio
n
4.7 Electrical Installation
The Kensa
’
Shoebox
’
heat pump range is available in single phase power supply versions and the single
compressor is fitted with a fly lead.
Any electrical work required to install or maintain this appliance should be carried out by a suitably
qualified electrician in accordance with current IEE regulations
To access the wiring terminals :
-
i.
remove the top of the shoebox with a short sharp pull forwards and up.
ii.
Unscrew the 2 pozi screws on either side of the front panel.
Fig 17 3kW Electrics panel folded down (lid removed from PCB box)
2 x 5mm cross
head screws
Fig 16 Position of cross head screws on the Electronics cover Plate
iii.
Pull the front cover down using the handle.
iv.
The wiring terminals will now be exposed.
Cables should enter the unit from the back using the cable entry ports provided.