
Shoebox Heat Pump Manual Version 9.4
Page 16 of 40
vii.
Thread the timeclock/room thermostat wires into the back of the
’
Shoebox
’
and connect them to
the terminals required, ( see electrical installation section ).
viii.
For applications where Domestic Hot Water has been specified a 3 port diverting valve
(‘
W
’
plan) is
provided by Kensa and when the timeclock calls for DHW production is used to divert the flow from
space heating to an indirect coil in the DHW tank, (See DHW schematic, Section 4.4). The diverting
valve should be the first connection in the heat pumps flow line, before any underfloor heating
manifolds. The valve
’
s electrical connections are connected to the heat pump
’
s internal wiring.
(See 4.7.4)
ix.
Check and rectify any leaks that may be in the plumbing system.
x.
The appliance should be left for 12 hours after installation before it is turned on, to allow the
refrigerant to settle. The area where the heat pump is installed must be dry and rodent free.
Sa
fe
ty
in
fo
rma
ti
o
n
G
en
er
al
p
ro
d
u
ct
in
fo
rma
ti
o
n
In
sta
lla
tio
n
In
sta
lla
tio
n
sch
ema
tics
In
sta
lla
tio
n
me
ch
an
ica
l
In
sta
lla
tio
n
ele
ctr
ica
l
Co
mmu
n
al
G
ro
u
n
d
Ar
ra
y
Co
mmi
ss
io
n
in
g
Fa
u
lt
Fin
d
in
g
Wa
rr
an
ty
He
at
P
u
mp
se
tti
n
gs
sh
ee
t
In
tr
o
d
u
ctio
n
Fig 13 Shoebox with flexi
connections