22 Ejection chute
C1200
Installation of ejection chute after delivery
After delivery of the machine, mount the
servomotor of the ejection flap.
Remove the split cutter pin from the
securing bolt and mount the motor.
Feed the cable of the servomotor
through the cable duct.
Ensure that the cable is sufficiently long
so that it is not damaged or twisted when
the ejection chute is moved.
Do not
tighten
the
cable
but ensure that there
is ample play.
The ejection chute can be folded down,
e.g. in the event of a blockage. To do
this, loosen the two brackets. The
clamping force of the brackets can be
adjusted by means of the eyebolts.
When placing the ejection chute onto the
flange surfaces, ensure that they are
clean.
The ejection chute can be equipped with
a
gas-filled strut
(optional)
facilitating opening and closing of the
chute.
Содержание Champion C 1200
Страница 13: ...10 Designation of assembly groups C 1200 ...
Страница 15: ...12 Champion harvesting technology C 1200 ...
Страница 17: ...19 Technical instructions C 1200 ...
Страница 19: ...19 Technical instructions C 1200 ...
Страница 29: ...30 Operating instructions C 1200 ...
Страница 42: ...32 2 Blade rotor C1200 Installation position ...
Страница 45: ...35 Greasing chart C 1200 ...
Страница 47: ...35 Greasing chart C 1200 ...
Страница 48: ...35 Greasing chart C 1200 ...
Страница 51: ...38 Maintenance and inspection C 1200 ...
Страница 53: ...38 Maintenance and inspection C 1200 ...
Страница 55: ...40 Electric circuit diagram C 1200 ...