20
Basic operation
Unfolding:
6. Turn tension isolation valve off (see Fig 14 for location of valve).
7. Walk around and check that all chain links are straight and that working height of all swivels are
correct for field conditions. Adjust if neccessar, see section frame height adjustment Fig 19.
8. Move off with all chains in working position. If neccessary it is acceptabe to raise frame to transport
height. This will lift the front chains off the ground and reduce the load on the tractor. Lower the frame
once operating speed is reached.
Transport safety lock valves
Tension isolation valve
Fig 13.
Fig 14.
Содержание CL1
Страница 10: ...10 Section 1 Warranty ...
Страница 14: ...14 Section 2 Machine Operation ...
Страница 16: ...16 Park brake Fig 7 Rotate counter clockwise to apply brake ...
Страница 19: ...19 The chain is set correctly at 69 Bar 1000 psi Fig 12 ...
Страница 22: ...22 Folding Fig 16 ...
Страница 23: ...23 Fig 17 Folding ...
Страница 24: ...24 Fig 18 Folding ...
Страница 25: ...25 Section 3 Chain Operation Correct Setup ...
Страница 27: ...27 Wing set up prior to operating Make sure the pin is centred Fig 22 ...
Страница 29: ...29 Fig 24 ...
Страница 31: ...31 Fig 26 ...
Страница 33: ...33 Dropleg height adjustment Fig 29 ...
Страница 36: ...36 Section 4 Maintenance Inspection ...
Страница 40: ...40 Section 5 Specification ...
Страница 42: ...42 Section 6 Pre Delivery Checklist ...
Страница 44: ...44 Notes ...
Страница 45: ...45 Notes ...
Страница 46: ...MANOPE 6M Issue C 20 01 2020 ...