Unwrapping and Inspecting Your Board
3-1
3
Setup and Installation
This section describes inspection, software installation, configuration,
and hardware installation for DAS-1800ST/HR Series boards. Read this
section before you attempt to install and use your board.
Unwrapping and Inspecting Your Board
After you remove the wrapped board from its outer shipping carton,
proceed as follows:
1. The board is packaged at the factory in an anti-static wrapper that
must not be removed until you have discharged any static electricity
by either of the following methods:
–
If you are equipped with a grounded wrist strap, you discharge
static electricity as soon as you hold the wrapped board.
–
If you are not equipped with a grounded wrist strap, discharge
static electricity by holding the wrapped board in one hand while
placing your other hand firmly on a metal portion of the computer
chassis (your computer must be turned off but grounded).
2. Carefully unwrap your board from its anti-static wrapping material.
(You may store the wrapping material for future use.)
3. Inspect the board for signs of damage. If damage is apparent, arrange
to return the board to the factory (see “Technical Support” on page
7-6).
4. Check the remaining contents of your package against the packing
list to be sure your order is complete. Report any missing items
immediately.
Artisan Scientific - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisan-scientific.com
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com