manualshive.com logo in svg
background image

Rack preparation

1. Select a location in the rack. The assembly will take up 5

¼

 inches of vertical space.

2. Hold up the front panel at the selected location in the rack. The four slotted mounting holes in the front panel dictate the

location of the captive nut fasteners on the four rack rails. Mark where the fasteners are to be installed.

3. Referring to Figure 1, install four fasteners so that the captive nuts are located behind the appropriate holes on the front

rack rails.

Figure 1 
Fastener installation

Instrument preparation

1. Remove the handle from the 3

½

-inch instrument. There are two styles of handles; the newer style has orientation arrows

at each handle end that are molded onto the plastic.

A. With the old style handle, rotate it to the uppermost position. With the new style, rotate it under the instrument until the

arrows on the handle ends line up with arrows on the mounting ears.

B. Pull out on the handle ends until the handle is clear of the mounting ears, and then remove the handle.

2. Remove the screw that secures each mounting ear to the case, and remove both mounting ears.

NOTE

Save all removed parts for reinstallation if the instrument is ever removed from the rack in the future.

Отзывы: