
25025
2. Align and level drive unit.
Front to rear alignment
Center the drive unit in the drive gap. The 25mm x 25mm tubing should extend
50mm past the formed cross sills at each end of the drive unit. The 50mm x
150mm cross -drive tubing should be parallel to trailer cross-members.
Side to side alignment
Recommended method:
After the sub-deck is welded or bolted down, use a straight edge to align
punched holes in the drive shoes with centers of respective 25mm x 25mm
tubing. Do this with at least two shoes on each side of the trailer (Figure 21).
Optional method if trailer is perfectly straight:
Align the drive unit's center punch marks with the trailer's centerline.
Figure 20
6mm
6mm
Содержание Running Floor II Metric
Страница 23: ...the 25mm x 25mm tube to the top of the drive shoe is critical Raise or lower the drive unit accordingly...
Страница 31: ...Figure 38 Figure 37 50mm...
Страница 40: ...25044 Figure 45...