TIGHTNESS TEST
(only applicable for
KANE3500-1/UK and KANE3500-2/UK)
After completing the let-by test (or after
selecting NO), the stabilisation and tightness
test can be performed.
The display shows :
CONNECT
P 0.00
Connect the meter to the system under test
and adjust the pressure accordingly. Once
the correct pressure has been achieved press
.
TIME 59
P3 19.95
TIGHTNESS TEST
(only applicable for
KANE3500-1/UK and KANE3500-2/UK)
After completing the let-by test (or after
selecting NO), the stabilisation and tightness
test can be performed.
The display shows :
CONNECT
P 0.00
Connect the meter to the system under test
and adjust the pressure accordingly. Once
the correct pressure has been achieved press
.
TIME 59
P3 19.95