GENERAL OPERATION
When the instrument is first switched on
using
, the top line of the display
shows in sequence the date, the time, the
model version number, the battery status and
the pressure units. The bottom line of the
display shows a countdown number that
starts at 10 and reduces to zero. At zero the
meter display two lines of data.
The display shows 2 lines of data and all
data can be printed via an optional
infrared printer. The printed data can be
'live' data, 'frozen data' or stored data.
255 sets of tests can be stored in non-
volatile memory.
GENERAL OPERATION
When the instrument is first switched on
using
, the top line of the display
shows in sequence the date, the time, the
model version number, the battery status and
the pressure units. The bottom line of the
display shows a countdown number that
starts at 10 and reduces to zero. At zero the
meter display two lines of data.
The display shows 2 lines of data and all
data can be printed via an optional
infrared printer. The printed data can be
'live' data, 'frozen data' or stored data.
255 sets of tests can be stored in non-
volatile memory.