3 Installation
Power Conversion System BCS-B-H Series (1000K-1500K)
User Manual
26
All rights reserved © Kehua Data Co., Ltd.
The PCS must be transported by trained professionals.
While transporting, please move gently and avoid impacting or dropping.
If the PCS needs to be stored for long time after unpacking, it is suggested to pack the device by
original plastic bag.
3.3.1 ForkliftTransportation
The PCS can be transported by forklift, as shown in Figure3-4.
During transporting the PCS by forklift, it is necessary to keep the center of gravity in the centre
of the two forks, and the transportation process should be slow and steady.
When the PCS is lifted by forklift, please keep stable and balance.
During moving, the tilting angle of the device should not exceed 15
°
. Do not put down or lift
the device suddenly.
Figure3-4
Forklift transportation
3.3.2 Lift Transportation
The PCS also can be lifting transported by the top girder, as shown in Figure3-5. Before lifting,
ensure that the distance between lifting hook and the top of the PCS is more than 1m, and keep the
transportation process slow and steady to avoid heavily rock.
Содержание BCS-B-H Series
Страница 1: ...Power Conversion System BCS B H Series 1000K 1500K User Manual...
Страница 2: ......
Страница 96: ...4402 02858 005...