Power Conversion System BCS-B-H Series (1000K-1500K)
User Manual
3 Installation
All rights reserved © Kehua Data Co., Ltd.
37
3.7 Check the Installation
To ensure normal operation, after all installation and wiring is finished, please check the following
items.
Check if the installation environment meets the requirement.
Check if the installation clearance is with enough heat dissipation space to ensure normal work.
Check if the PCS is fixed to floor firmly.
Check if the wire connection is proper.
−
The anode and cathode on DC side is connected correctly.
−
The phase sequence of phase-U, phase-V, phase-W on AC side is connected rightly.
Check if the connection of each cable is firm.
Check if there is bend stress of each wire.
Check if there is overlap or scraping risk among wires and plates.
Check if the cable arrangement and tie up is accord with the specification.
Содержание BCS-B-H Series
Страница 1: ...Power Conversion System BCS B H Series 1000K 1500K User Manual...
Страница 2: ......
Страница 96: ...4402 02858 005...