The installation tools must be insulated to avoid electric shock.
3.2.2 Installation Environment
Before installation, ensure that the installation site satisfy the basic condition of safety and normal
operation. If the site condition is not OK, please do corresponding transform.
The installation environment of the PCS should meet the following requirements:
The device is indoor PCS and meets IP20 protection grade. Install the device in an environment
where is dry and free of dust.
The PCS is very heavy (weight: 1370kg), so, the installation floor must be with a certain load
bearing to support the PCS.
The foundation of installation position must be stable and safe.
According to EMC and noise grade, the PCS is used for industry environment, so the installation
position should be far away living quarters.
The temperature should be within the range of -30
℃~
+65
℃
and the
relative humidity
should
be within the range of 0
~
95% (with no condensation) to ensure the energy storage stay in a good
work environment.
3.2.3 Installation Clearance
The dimension of the PCS: without girder: 1400mm
×
2000mm
×
800mm (W
×
H
×
D), (with
girder: 1400mm
×
2063mm
×
800mm(W
×
H
×
D)), the installation site should be with enough
space to place the device.
The minimum installation clearance requirement for the energy storage is as shown in Figure3-2.
If allowable, we recommend a larger space between the PCS and adjacent device or wall, which
is to ensure stable and high efficient running of the PCS.
When the PCS is used in parallel system, the space of whole system after paralleled should meet
the requirement in Figure3-2.