Power Conversion System BCS-B-H Series (1000K-1500K)
User Manual
3 Installation
All rights reserved © Kehua Data Co., Ltd.
27
Figure3-5
Lift transportation
3.4 Unpacking
For the package is large, please select the package site in advance. In principle, the package site
should be as close as possible to the installation site.
Step 1
Check if the package appearance is in good condition and if there has any transportation damage. If
any damage, please inform the carrier immediately.
Step 2
Transport the PCS to assigned site.
To avoid toppling over during transporting, we do some special design for the wooden bracket. When
transporting by motor-driven forklift or manual forklift, insert the forklift arm form the FRONT of
the wooden bracket, as shown in Figure3-6.
Содержание BCS-B-H Series
Страница 1: ...Power Conversion System BCS B H Series 1000K 1500K User Manual...
Страница 2: ......
Страница 96: ...4402 02858 005...