background image

USER MANUAL 

Spirit User manual 

 

page 17 

Indicator lights 

Two groups of indicator lights are found on the bottom of the electronics box, see Figure 14. The set 
on the left hand side (3 lights) indicate if the steam boiler heating element gets power or not. The set 
on the right consists of 2 (Duette) or 3 (Triplette) lights and indicate if the individual coffee-boiler 
heating elements get power or not. If the machine is functioning correctly, the 3 lights on the left 
(steam boiler heating) should always light up simultaneously, the lights on the right show more erratic 
behaviour. All lights should be “in sync” with the indicator dot on the corresponding temperature 
controller.  

If there is a problem with the machine, these indicator lights help to determine possible causes. 

 

 

Figure 14. The heating element indicator lights on a Spirit Duette, left indicator lights for the steam 
boiler, right for the coffee boilers. The indicator dot on the left hand coffee boiler controller is lit and the 
corresponding indicator light (left light of right set) as well. The indicator dot on the steam boiler 
controller is lit, as are all steam boiler indicator lights (left set). The right coffee boiler controller is in 
ECO mode and the indicator dot is not lit, the corresponding indicator light (utmost right light) is off. 

lower - middle 

– upper 

STEAM 

left 

– right 

COFFEE 

Содержание Spirit DUETTE

Страница 1: ...Spirit User manual page 0 User manual Spirit original instructions Document ID Sup Rum Eng Date of issue October 22 2015 Revision date June 24 2020...

Страница 2: ...Change boiler temperatures 13 Switch boiler temperatures with St rk ST25 Eco controllers 13 Procedure to change from operational to Eco mode 13 Procedure to return from Eco to operational mode 13 Proc...

Страница 3: ...imilarly qualified persons in order to avoid a hazard The new hose sets supplied with the appliance are to be used Old hose sets should not be reused Intended use of the appliance is restricted to wel...

Страница 4: ...e 30 0 50 ppm Chloride 0 0 30 ppm Silica 0 0 5 ppm Odour and colour clean fresh odour free clear Taste influencing organic compounds not present Chlorine Hypochlorite Chloramines Iron Lead Manganese S...

Страница 5: ...boiler heating ON OFF switch 6 Coffee boiler PID temperature controller left group 7 Coffee boiler heating ON OFF switch left group 8 Volume switch left group 9 Program button left group 10 Group ind...

Страница 6: ...Showing mains switch with its 3 positions the right hand brew lever and steam lever on the right steam wand Figure 3 b right Showing hot water lever and spout and a coffee boiler pressure gauge Back l...

Страница 7: ...consistent volume programming procedure should be followed to have Consistency in programmed volumes Volumes should be programmed as if you are making a normal brew with fresh coffee grinds in the fil...

Страница 8: ...low to very fast flow we install different flow meters for different preferred brews 0 7mm aperture 3300 pulse litre for short brews like ristrettos and espressos 1 15mm aperture 2000 pulse litre for...

Страница 9: ...Have a pre filled and tamped portafilter ready 1 Keep the upper button 5 of the left hand touchpad pressed for 6 seconds until the upper LEDs of all touchpads start flashing to enter the programming m...

Страница 10: ...tton on the left touchpad turn the mains switch to NO HEAT or ON 3 The cleaning program pressurises and de pressurises all groups simultaneously for 8 times in a row 4 As soon as the program has ended...

Страница 11: ...mped portafilter ready 1 Keep the push button of the left group pressed for about 6 seconds until the LEDs of all Bastones start flashing to enter the programming mode You may now program any one of t...

Страница 12: ...k flush program See paragraph Back flush group on page 19 for complete back flush procedure 1 Shut down machine by turning mains switch to OFF 2 Make sure that the toggle switch under the left hand gr...

Страница 13: ...sition steam valve closed Before steaming milk it is necessary to open the valve for a short while to purge water from the steam wand and heat up the wand and valve The purged water is condensate from...

Страница 14: ...7 70 158 Coffee boiler 93 199 50 122 Display example 125 Turn power OFF and ON Eco Table 3 Factory set temperatures in the Spirit and way to switch between modes Procedure to change from operational t...

Страница 15: ...ee bed and drain the pressure gauge will display 0 bar When brewing a shot the coffee bed becomes less permeable after wetting pre infusion stage and pressure will rise until brew pump pressure is rea...

Страница 16: ...ispensing by shortly pressing the hot water lever down Water will start flowing Note Work swiftly the boiler quickly empties when hot water is dispensed continuously 4 Measure the temperature of the o...

Страница 17: ...nor influence During the extraction phase it is mainly pump pressure and coffee bed characteristics that determine the flow rate Variables in the coffee bed are numerous the most important depend on t...

Страница 18: ...iour All lights should be in sync with the indicator dot on the corresponding temperature controller If there is a problem with the machine these indicator lights help to determine possible causes Fig...

Страница 19: ...drain and flush it with some hot water down the drain to prevent clogging of the drain hose Remove filter basket Materials needed Group screen extractor or back end of teaspoon Procedure 1 Remove the...

Страница 20: ...essurised you do the same with the next group etc Described next is the procedure for an individual group in which the other group s remain s operational Materials needed Plastic group brush included...

Страница 21: ...uncture the group screen Pry left and right the screen will fall out together with the group seal 2 Remove the group seal from the group screen 3 Soak the metal group screen in a solution of coffee di...

Страница 22: ...fork or spoon Plastic brush included in shipment Coffee dissolving powder included in shipment Procedure 1 Remove group screen and group seal see previous item 2 Remove the two bolts from the plastic...

Страница 23: ...span than the black POM Procedure 1 Remove the group dispersion plate see previous item 2 Gently pull the dispersion base from the group bottom pull as perpendicular as possible Do not twist the disp...

Страница 24: ...boiler for leakage Check opening pressure of expansion valves on inlet manifold adjust when necessary Every 6 months quarterly maintenance PLUS Check dispersion plate and base replace when necessary...

Страница 25: ...Spirit User manual page 24 Maintenance Record machine number __________________ installation date _________________________________ Date Task Comments...

Страница 26: ...annot be held responsible for damage and or injuries resulting from actions performed on our machines by non qualified personnel Any qualified technician working on the Spirit is urged to thoroughly r...

Отзывы: