manualshive.com logo in svg
background image

2

only on the type of gas specified by the user and indi-
cated on the serial plate located inside the door. The
gas may be natural, propane or manufactured. The
type of gas cannot be converted to another gas fuel by
turning or engaging a switch.

GAS CONNECTIONS AND PIPE SIZE

A single Keating Gas Fryer requires a standard gas
pipe size of 3/4 inch (19mm) I.D. connection. Multiple
fryers with a common manifold will require a minimum
of 1 1/4 inch I.D. gas supply line. The size of the gas
supply pipe is very important. If the pipe is too small
you will have low gas pressure at the Keating Gas
Fryer manifold. Low gas pressure will cause slow
recovery and/or delayed ignition. If you have a question
about gas pipe size call your local gas company.

C

CA

AU

UT

TIIO

ON

N

Before connecting new pipe to the Keating Gas Fryer
the pipe must be blown out to remove all foreign parti-
cles. These particles in the controls or burners may
cause improper or dangerous operating conditions.

C

CA

AU

UT

TIIO

ON

N

Pipe joint compounds that are used on threaded joints
of appliance piping shall be resistant to the action of liq-
uefied petroleum gases (Loctite PST 56765). When
using pipe joint compound do not apply to the first two
threads. Use only very small amount and only on male
threads. This will prevent clogging of burner orifices
and the gas valve. Never use compound on female
threads as it might be pushed into the gas valve.

Have your installer check for gas leaks using a soap
and water solution before operating. DO NOT USE AN
OPEN FLAME TO CHECK FOR GAS LEAKS.
1) The Keating Gas Fryer and its individual shut off
valves must be disconnected from the gas supply pip-
ing system during any pressure testing of that system
at test pressures in excess of 1/2 psi (3.45kPa) (13.84
in WC) High pressure can damage the gas valve caus-
ing a hazardous condition.

2.) The appliance must be isolated from the gas supply
piping system by closing its individual manual shutoff
valve during any pressure testing of the gas supply pip-
ing system at test pressures equal to or less than 1/2
psi (3.45 kPa). 

NOTE: 

Line pressure must be kept

below 10” (Nat), 13” (LP) to avoid
damage to the gas valve.

The required gas pressure for proper
operation of each fryer is 4" water col-
umn for natural gas and 10" water col-
umn for propane gas at the burner
manifold.

If more than one gas unit is on the same supply line,
you may require a larger line. Consult your local gas
company to assure adequate volume and pressure.
Refer to serial plate for proper gas requirement for your
particular model.

FLEXIBLE GAS CONNECTORS AND QUICK DIS-

CONNECT DEVICES

For an appliance equipped with casters:

The installation shall be made with a connector that
complies with the Standard for Connectors for Movable
Gas Appliances, ANSI Z21.69 or the Standard for Con-
nectors for Moveable Gas Appliances, CAN/CGA-6.16,
and a quick disconnect device that complies with the
Standard for Quick-Disconnect Devices for Use With
Gas Fuel, ANSI Z21.41 or the Standard for Quick Dis-
connect Devices for Use with Gas Fuel, CAN1-6.9.

RESTRAINING DEVICES

1.) Adequate means must be provided to limit the

movement of the appliance without
depending on the connector and the
quick-disconnect device or its associ-
ated piping to limit the appliance
movement.

Fryer must also be restrained to pre-
vent tipping when installed so that hot
liquid splashing is avoided.

2.) The restraint means must be

attached to the rear of the Keating Gas Fryer within 2"
of the center line width and approximately 1-5/8" from
the bottom of the cabinet back to allow the restraining
bolt to be anchored to the cabinet back between the
cabinet bottom and inner liner.
IF DISCONNECTION OF THE RESTRAINT IS NEC-
ESSARY, IT MUST BE RECONNECTED WHEN THE
KEATING  GAS FRYER IS RETURNED TO ITS ORIG-
INALLY INSTALLED POSITION.

INSTALLATION

The installer is responsible for attaching the tipping
restraint.

ELECTRICAL CONNECTION

The Keating Gas Fryer, when installed, must be elec-
trically grounded in accordance with local codes, or in
the absence of local codes, the National Electrical
Code, ANSI/NFPA No. 70. or the Canadian Electrical
Code, CSAC-22.2 as applicable. A wiring diagram is
located on the last page. In the U.S.A. and Canada, the

electrical supply must be 120 VAC, 60
Hz.

W

WA

AR

RN

NIIN

NG

G

This appliance is equipped with a
three-prong 120 Volt NEMA 5-15
(grounding) plug for your protection
against shock hazard and should be
plugged directly into a properly
grounded and polarized three-prong

Содержание NSTANT RECOVERY AA2000

Страница 1: ...ioning 1 Ventilation 1 National Code Requirement 1 Gas Connectors Pipe Size 2 Flexible Gas Connection Quick Disconnect Devices 2 Restraining Devices 2 Electrical Connection 2 Leveling 3 PLACING YOUR K...

Страница 2: ...l gas supplier THE EQUIPMENT IS TO BE INSTALLED TO COMPLY WITH THE BASIC PLUMBING CODE OF THE BUILDING OFFICIALS AND CODE ADMINISTRATORS INTERNATIONAL INC BOCA AND THE FOOD SER VICE SANITATION MANUAL...

Страница 3: ...will be supplied by the car rier DO NOT RETURN DAMAGED MERCHANDISE TO KEATING FILE YOUR CLAIM AS ABOVE FIRST STEPS POSITIONING Keep appliance area free and clear of any com bustibles Position the Kea...

Страница 4: ...age to the gas valve The required gas pressure for proper operation of each fryer is 4 water col umn for natural gas and 10 water col umn for propane gas at the burner manifold If more than one gas un...

Страница 5: ...ers on ALWAYS disconnect fuel source and power supply before servicing NEVER move a fryer when full of oil NEVER introduce objects or liquids into fryer while operational which are not designed or mad...

Страница 6: ...will come on HIGH LIMIT TEST PROCEDURE All Models DO BI MONTHLY STEP 1 Place a suitable thermometer in the oil on the front left corner of the fryer 2 from the top to check temperature STEP 2 Set the...

Страница 7: ...WER switch to ON posi tion Its green light and the timers will come on STEP 3 Light constant pilot located on left side of pilot runner tube STEP 4 Hold the PUSH TO LIGHT switch for 30 seconds The pil...

Страница 8: ...realize substantial savings in oil costs as well as maintenance charges We have listed some of the conditions which are catalysts in the breakdown of oil 1 Contact with Oxygen 2 Carbonization of Crum...

Страница 9: ...ly rinse fryer vessel with potable water to remove all Klenzer Prior to refilling with oil wipe the inside of the fryer vessel making sure all water and Klenzer have been removed NOTE Do not pump wate...

Страница 10: ...ssel making sure all water and Klenzer have been removed DO NOT DAMAGE OR REPOSITION THERMOSTAT PROBE AS THIS MAY AFFECT THE ACCURACY OF THE FRYER C CA AU UT TI IO ON N DO NOT MIX WATER AND HOT OIL 12...

Страница 11: ...THERMOSTATS These operational problems can easily be correct ed by thermostat bulb positioning Keating s patented thermostat application is accu rate within 2 F of the dial setting between 250 F 350 F...

Страница 12: ...r fryer 10x11 18 up The end of thermostat bulb should touch the burner tube for 14 fryers 6 Replace burners 7 Replace control panel back 8 Slide back fabric shield over capillary and care fully coil c...

Страница 13: ...lon will flash at a one second rate When the countdown has reached 00 00 the relay output contacts will open the display will flash and the audible alarm will sound To can cel the audible alarm press...

Страница 14: ...7406 G 1 SWITCH ROCKER WHITE MOMENTARY PUSH TO LIGHT 032297 H 1 INDICATING LIGHT AMBER 021254 J 1 SWITCH ROCKER WHITE LIGHT REPLACEMENT KIT 058328 K 1 SWITCH ROCKER WHITE MOMENTARY HIGH LIMIT TEST 032...

Страница 15: ...Drain Shown QTY DESCRIPTION P N A 3 3 FIN RADIANT 000041 B 1 POT 14 GAS WELDMENT Call 800 KEATING C 3 BURNER 028048 D 1 DRAIN VALVE 004553 1 REAR DRAIN VALVE NOT SHOWN 016341 E 1 RUNNER PILOT ASSEMBLY...

Страница 16: ...LP 023624 POT ASSEMBLY 20BB 20TS GAS Front Drain Shown QTY DESCRIPTION P N A 4 3 FIN RADIANT 000041 B 1 POT 20 GAS WELDMENT Call 800 KEATING C 4 BURNER 028048 D 1 DRAIN VALVE 004554 1 DRAIN VALVE 2 FR...

Страница 17: ...15 AA2000 ELECTRICAL ASSEMBLY BB2000 ELECTRICAL ASSEMBLY...

Страница 18: ...16 Electrical Assembly not shown to scale TS2000 ELECTRICAL ASSEMBLY Electrical Assembly not shown to scale BB ELECTRICAL ASSEMBLY WITH SE FILTER...

Страница 19: ...17 TS ELECTRICAL ASSEMBLY WITH SE FILTER BASKET LIFT ELECTRICAL ASSEMBLY ALL FRYERS...

Страница 20: ...Stir oil repeatedly with a paddle until water boils off Filter oil If necessary allow oil to cool Drain about one quart of it to remove remaining water Basket lift mechanism a Connections are loose or...

Страница 21: ......

Страница 22: ..._______________________________________________________________ INVOICE NUMBER ____________________ SERIAL NUMBER ________________________________________ FRYER FILTER SYSTEM GRIDDLE REMARKS _________...

Отзывы: