manualshive.com logo in svg
background image

2

NEVER move a fryer when full of hot oil.

NEVER introduce objects or liquids into fryer, while 
operational, which are not designed or made for 
cooking.

THIS FRYER MAY NOT BE ALTERED, MODIFIED OR 
CHANGED IN ANY WAY. 

WARNING  

IMPROPER INSTALLATION, SERVICE OR
MAINTENANCE CAN CAUSE PROPERTY
DAMAGE, INJURY OR DEATH. READ THESE
INSTALLATION, OPERATING AND MAINTENANCE
INSTRUCTIONS THOROUGHLY

BEFORE

INSTALLING OR SERVICING THIS EQUIPMENT.

II INSTALLATION

This fryer MUST be installed, inspected, calibrated and
serviced by qualified and/or certified and/or licensed
service personnel - you may void your Keating
warranty if installation is not completed per local,
national and Keating specifications. Contact your
dealer for assistance.

DAMAGE DURING 
SHIPMENT

The fryer has been assembled, tested and inspected at
the factory. Upon arrival, the complete fryer should be
checked for any damage that may have occurred
during shipment.

The carrier is responsible for all damage in transit
whether visible or concealed. Do not pay for the freight
bill until the fryer has been thoroughly checked for
damage. If concealed damage is found later, contact
the carrier immediately to file a claim.

What to do if equipment arrives damaged:

VISIBLE LOSS OR DAMAGE – Be certain to note
this on the freight or express receipt and have it
signed by the delivery person.

FILE CLAIM FOR DAMAGES IMMEDIATELY –
Regardless of extent of damage.

CONCEALED LOSS OR DAMAGE – If damage is
noticed when equipment is unpacked, notify the
freight company immediately, and file a “concealed
damage claim”. This MUST be done immediately. Be
sure to retain the shipping container for inspection.

Keating does not assume responsibility for Loss OR
Damage incurred in transit.

INSTALLATION

Installation must conform with local codes or, in
absence of local codes, with the current National
Electrical Code ANSI/NFPA 70 or Canadian Electrical
Code CAN 22.2 as applicable. 

NOTE: For safety purposes, all Hi-Limit controls are
manually reset. Always check the Hi-Limit reset button
before attempting to use the fryer. It is possible that the
Hi-Limit button may have been accidentally activated
on a new fryer while in transit.

POSITIONING

The fryer must be placed under an exhaust hood with
a fire retardant system. Your ventilation hood, when
installed, must conform to the current ANSI/NFPA 96
standard. 

ALL

connections and placement must

comply with current local and national codes. It is the
responsibility of the owner and local installer to comply
with these regulations when installing the fryer.

Counter model and floor model fryers 

must be

restrained to prevent tipping

when installed in order

to avoid splashing, spilling, etc. of hot liquid. The
restraining method may be a manner of installation or
by separate means.

LEVELING

The fryer will operate at its highest efficiency when
properly leveled. Place a level on fryer vessel from side
to side. For fryers on legs, the bottom foot of the leg is
adjustable. Looking from the bottom of the foot, turn
counter clockwise to decrease height or clockwise to
increase height until level. For fryers on casters, the
casters are adjustable by loosening the jam nut and
turning the caster in or out. When the desired level is
reached, tighten the jam nut. Adjustments of more than
19mm are not recommended on any caster. The same
procedure should be followed to level the fryer from
front to back.

Figure 2-1

Figure 2-2

Содержание INSTANT RECOVERY GAS FRYER

Страница 1: ...INSTANT RECOVERY ELECTRIC FRYER SERVICE MANUAL KEEP THIS MANUAL FOR TRAINING NEW PERSONNEL 1 800 KEATING www keatingofchicago com elecFryPre2000_0310 03 13 part 000784...

Страница 2: ...7 18 34 x24 Basket Lift Control Panel 18 14 Basket Lift Housing and Roller Guide Parts List 19 18 34 x24 Basket Lift Housing Roller Guide and Transformer Box Parts List 20 SECTION VII WIRING DIAGRAMS...

Страница 3: ...come with all the same features as the TS Model The Basket Lift mechanism lowers the baskets of food into the oil when the timer button is pressed and raises the baskets when the cooking cycle is comp...

Страница 4: ...the shipping container for inspection Keating does not assume responsibility for Loss OR Damage incurred in transit INSTALLATION Installation must conform with local codes or in absence of local code...

Страница 5: ...If your fryer is to be fed by a 208 or 220 volt system consult the Keating Fryer Specifications on pages 37 and 38 to determine the full load rating of the fryer NOTE Some fryers with Basket Lifts Zer...

Страница 6: ...el and a true COLD ZONE mean extended oil life Follow cooking procedures below for your model WARNING OPERATION OF THIS FRYER SHOULD BE LIMITED TO PERSONNEL WHO HAVE BEEN THOROUGHLY TRAINED IN OPERATI...

Страница 7: ...ly lower into fryer vessel 8 When cooking cycle is complete an audible alarm will sound and the basket s will raise automatically Allow oil to drain before removing baskets D CPU Model See separate co...

Страница 8: ...age 5 Draining 2 Turn the fryer off 3 Drain oil from fryer see page 5 Filtering may be done at this step 4 Remove oil container to a secure area to prevent accidental spillage 5 Fill fryer vessel to F...

Страница 9: ...yer with new or filtered oil ELECTRONIC CONTROL TIMERS The electronic timers provide a clearly visible and accurate display and are very easy to use 10X11 14 TS MODELS A Keating Electronic Timer B How...

Страница 10: ...in upper position 10 08 2 Clock mode display will show a decimal point in lower position 10 08 OPTIONAL TIMER OPERATING INSTRUCTIONS PART 056921 DIGITAL TIMERS The electronic timers standard on TS mod...

Страница 11: ...ognized as being the best metal for use in the construction of fryer vessels That is why all Keating fryer vessels and heating elements are made of stainless steel that is highly polished to a 7 mirro...

Страница 12: ...last 15 25 seconds ensuring that the temperature setting is held within a narrow band Every Keating Instant Recovery Electric Fryer has a number of safety controls to ensure safe operation and guard a...

Страница 13: ...replace if necessary c Dirty fryer vessel c Boil out fryer See page 10 Cleaning and Boil out d Inferior grade of oil d Check with oil supplier for higher grade of oil needed fir your cooking applicat...

Страница 14: ...goes a Basket Lift motor limit switch is a Align limit switch down but won t go up misaligned 10x11 and 15 TS BL models Basket Lift buzzer won t a Buzzer limit switch is misaligned a Align limit switc...

Страница 15: ...4 4 5 TERMINAL BLOCK 208 480V 034381 1 1 1 1 1 6 TERMINAL BLOCK 002565 3 1 7 CIRCUIT BREAKER 208 240V 1P 40A 012129 CALL 1 800 KEATING 2P 40A 015203 CALL 1 800 KEATING 3P 40A 015204 CALL 1 800 KEATIN...

Страница 16: ...14 ELECTRIC FRYER ASSEMBLY I NOTE Part numbers correspond with the Electric Fryer Parts List on page 13 ELECTRIC FRYER ASSEMBLY II Exploded view of heating element wire connection hardware...

Страница 17: ...0 5 ON OFF MELT SWITCH PLATE 1 009919 6 TOGGLE SWITCH ON OFF MELT 1 004326 7 INDICATING LIGHT AMBER 220V 2 004157 8 HI LIMIT TEST PLATE 1 004305 9 HI LIMIT TEST BUTTON 1 004304 10 POWER ON LIGHT PLATE...

Страница 18: ...AT KNOB BLACK 1 060612 4 RETAINING SCREWS 3 004610 5 LIGHTS WHITE 3 016639 LIGHT RED 1 016640 MOUNTING PLATE 1 6 TOGGLE SWITCH ON OFF MELT 1 004326 7 HI LIMIT TEST BUTTON 1 004304 8 TIMER 2 023709 9 M...

Страница 19: ...T KNOB BLACK 1 060612 4 RETAINING SCREWS 3 004610 5 SET OF 4 LIGHTS 120V WITH PLATES 1 004156 6 TOGGLE SWITCH ON OFF MELT 1 004326 7 HI LIMIT TEST BUTTON 1 004304 8 TIMER 2 023709 9 MELT CONTROL 120V...

Страница 20: ...NG SCREWS 3 004610 5 SET OF 4 LIGHTS 120V WITH PLATES 1 004156 6 TOGGLE SWITCH ON OFF MELT 1 004326 7 HI LIMIT TEST BUTTON 1 004304 8 TIMER ELECTRONIC 2 023709 9 MELT CONTROL 120V 1 004169 10 NUT WITH...

Страница 21: ...CCW LEFT Viewing front of fryer 1 000390 9 MOTOR CW RIGHT Viewing front of fryer 1 000391 10 BUZZER ON OFF SWITCH WITH PLATE 1 004499 11 BUZZER 1 004223 12 FUSE HOLDER 2 SEE PAGE 13 13 FUSE GROUND FA...

Страница 22: ...LIFT ROD FOR SPLIT BASKETS 2 020086 6 BUSHING PUSH ROD 4 016405 7 BUSHING RETAINING RING 4 015831 8 FUSE HOLDER 2 004335 9 FUSE ACTUATOR GROUND FAULT 3A SC 3 2 004334 10 TRANSFORMER STEPDOWN 120V 24V...

Страница 23: ...d should be saved for troubleshooting and maintaining the fryer The wiring diagrams in this section cover standard fryers which may or may not match the diagram sent with the fryer Non standard fryers...

Страница 24: ...22 14 TS AND 14 TS WITH WHIRL O SWIRL A WAY WIRING DIAGRAMS 14 TS WITH WHIRL O SWIRL A WAY 14 TS...

Страница 25: ...23 14 20 TS 18 20 TS WITH WHIRL O SWIRL A WAY WIRING DIAGRAMS 18 20 TS 18 20 TS WITH WHIRL O SWIRL A WAY...

Страница 26: ...24 14 TS WITH BASKET LIFT WITH WHIRL O SWIRL A WAY WIRING DIAGRAMS 14 TS WITH BASKET LIFT 14 TS WITH BASKET LIFT WITH WHIRL O SWIRL A WAY...

Страница 27: ...25 24 TS WITH BASKET LIFT WITH WHIRL O SWIRL A WAY WIRING DIAGRAMS 24 TS WITH BASKET LIFT 24 TS WITH BASKET LIFT...

Страница 28: ...SE 208 21 5 68 68 45 103 220 24 0 72 72 47 109 240 28 6 79 79 52 119 AMPS PER LINE THREE PHASE 4 ELEMENTS 6000 W EACH 24 BB FM E A M P S VOLTS kW SINGLE L1 L2 L3 PHASE 208 16 1 45 45 45 77 220 18 0 47...

Страница 29: ...68 129 220 30 0 72 95 72 136 240 35 7 79 103 79 149 AMPS PER LINE THREE PHASE 5 ELEMENTS 6000 W EACH 24 TS FM E A M P S VOLTS kW SINGLE L1 L2 L3 PHASE 208 21 5 68 68 45 103 220 24 0 72 72 47 109 240...

Страница 30: ......

Страница 31: ..._______________________ ADDRESS ______________________________________________________________________________________________________________ CITY ____________________________________________________...

Отзывы: