![KBR multimess F144-2-LED-ESMS 4 Series Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/kbr/multimess-f144-2-led-esms-4-series/multimess-f144-2-led-esms-4-series_user-manual-technical-parameters_659469002.webp)
© KBR Kompensationsanlagenbau GmbH
Misprints, printing errors
and technical changes reserved
2
KBR multimess F144-2-LED-ESMS...-4
Table of contents
1
Device memory, battery-buffered 8
2
Definition of terms ........................... 10
3
Field of application /
range of functions ............................ 11
4
Connecting the multimess
F144-2-LED-ESMS-...-4 .................... 13
4.1
Installation and assembly ............. 13
4.2 Installation .......................................... 13
4.3
Connection diagram ....................... 17
4.4
Terminal assignment ....................... 18
5
Control and display panel ............. 20
5.1
Description of sensor buttons
and displays ....................................... 21
6 Operation ............................................ 22
6.1
Menu structure of the multimess
F144-2-LED-ESMS-...-4 .................... 22
6.2
Navigation and device displays .. 23
7
Setting operating parameters ..... 24
7.1
General programming scheme ... 24
7.2
U Ph-Ph - Measuring reference
voltage / rated mains voltage ...... 25
7.3
I - Current transformer ratio ......... 26
8
Display functions .............................. 27
8.1
UPh-N - Voltage phase to neutral
conductor, frequency ..................... 27
8.2
UPh-Ph - Voltage phase to phase,
rotary field display ........................... 28
8.3
I /IN - Current / neutral conductor
current, instantaneous and
average value switch-over ............ 29
8.4
S - Apparent power / total
apparent power ................................ 30
8.5
P - Active power / total
active power ...................................... 31
8.6
Q - Reactive power / total
reactive power................................... 32
8.7
Cos φ - Fundamental power
factor, PF, total PF ............................. 33
7.8
kWh - Active energy HT/LT
consumption and recovery,
maximum cumulated cycle
active power ...................................... 34
8.9
kvarh - Reactive energy meter
HT/LT consumption and recovery,
maximum cumulated cycle
reactive power................................... 36
8.10 Harmon. - distortion factor and
partial harmonic content of the
voltage and current network
harmonics ........................................... 38
8.11
Extra ...................................................... 39
8.12 Maximum / Minimum
extreme values display ................... 43
8.13 Displaying limits ............................... 46
9 Programming..................................... 49
9.1
Period time current
average value .................................... 49
9.2
Tariff switching method ................. 50
9.3
Measurement period
synchronization ................................ 51
9.4
Programming limits ......................... 52
9.5
Setting time and date ..................... 54
9.6
Setting the bus address ................. 55