Drainage Pipe Installation
Before installation of the condensate pipeline, determine its direction and elevation to avoid intersection with other
pipelines to ensure that the slope is smooth and straight.
The highest point of the drainage pipe should be equipped with a discharge port to ensure the smooth discharge of
condensate water, and the discharge port must face downwards to prevent dirt from entering the pipe.
Do not connect the drainage pipe to the wastewater pipe, sewage pipe, or other pipes that produce corrosive
gases or odors. Otherwise, the IDU (especially the heat exchanger) may be corroded and odor may enter the
room, negatively impacting the heat exchange effects and user experience. The user will assume responsibility for
any consequences resulting from failure to abide by instructions.
After the pipeline connection is completed, a water test and a full water test should be done to check whether the
drainage is smooth and whether the pipeline system leaks.
The air conditioner drainage pipe must be installed separately from other sewage pipes, rainwater pipes and
drainage pipes in the building.
Adverse slope, convex and concave pipes are prohibited, as improper airflow will cause poor drainage.
Drainage pipes need to be evenly wrapped with thermal insulation pipes to prevent condensation.
Please connect the drainage pipes in the following ways. Improper installation of the pipes may result in water
leakage and damage to furniture and property.
All joints of the drainage system must be sealed to prevent water leakage.
Units without pumps: Use the attached drainage hose to connect to the drain pan outlet and PVC pipe,
and fasten the two ends of the drainage hose with a cable tie. Then push the thermal insulation pipe to be
closely attached to the main body, and finally fasten the end with a cable tie.
Units with pumps: Connect a PVC pipe to the water pump outlet, and fasten it with a cable tie. Then push the
thermal insulation pipe until it is closely attached to the main body, and finally fasten the end with a cable tie.
The connection between the two ends of the drainage pipes and the connection of the water pump outlet
need to be fastened with a cable tie, in combination with PVC/rubber adhesives. Pay attention to the
instructions for the use of the adhesives to prevent corrosion to the EPDM rubber. Use hard PVC adhesives
for connecting to other water piping. Check that the connections are tight with no leakage.
Caution
Installation of Water Discharge Pipe for the IDU
90°
Cable
tie
Rough
Slope
Burrs Scratches
Drainage
hose
Orifice of the PVC water discharge
pipe should be flat and smooth
PVC drainage pipe (outer diameter: 18mm) and
insulation pipe (During on-site installation, the
insulation pipe should be about 50mm longer
than the PVC water discharge pipe, so as to
ensure that there is enough casing at the ends
for insulation)