24
Installation Operation
1
Check Before Installation
Unpacking Check
①
After unpacking, check whether the packing materials are in good
condition, whether the accessories that come with the product are
complete, whether the air conditioner is intact, whether the surfaces of
the heat exchanger and other parts are not worn, and whether there
are oil stains on the stop valves of the unit.
①
Check the two sealing nuts of the refrigerant pipe, and observe whether
the red dot on the surface of the sealing nut of the gas pipe bulges. If it
bulges, the refrigerant system is well sealed; if it retracts, it is leaking,
and need to contact local dealer.
①
Check the model before installation.
①
After indoor unit and outdoor unit inspection, pack them with plastic
bags to avoid intake of foreign matters.
Refrigerant Connecting Piping Installation
1
Length and Level Difference Requirements for the Pipe Connections of IDU and ODU
When connect different series of outdoor units, the length and level differences of piping connections. Refer
to the Installation and Operation Manual of the outdoor unit.
CAUTION
During the installation of the connecting pipes, do not allow air, dust, and other debris to penetrate the piping system,
and make sure the interior of the pipes is dry.
Install the connecting pipes only when the indoor units and outdoor units are mounte.
When installing the connecting pipes, record the actual installation length of the liquid pipe so that additional
refrigerant can be added.
The connecting pipes must be wrapped with thermal insulation materials when they are installed.
In the event of refrigerant gas leakage during operation, please ventilate immediately.
Sealing
The red
dot bulges
Air
leakage
The red
dot retracts