PRODIGY Technical Manual
22
2. Air purging by refrigerant
Procedure:
1). Confirm that both the 2-way and 3-way valves are set to the closed position.
2). Connect the charge set and a charging cylinder to the service port of the 3-way valve.
3). Air purging.
Open the valves on the charging cylinder and the charge set. Purge the air by loosening the flare nut on
the 2-way valve approximately 4
5‟ for 3 seconds then closing it for 1 minute; repeat 3 times.
After purging the air, use a torque wrench to tighten the flare nut on the 2-way valve.
4). Check the gas leakage.
Check the flare connections for gas leakage.
5). Discharge the refrigerant.
Close the valve on the charging cylinder and discharge the refrigerant by loosening the flare nut on the
2-
way valve approximately 45‟ until the gauge indicates 0.3 to 0.5 Mpa.
6). Disconnect the charge set and the charging cylinder, and set the 2-way and 3-way valves to the open
position.
Be sure to use a hexagonal wrench to operate the valve stems.
7). Mount the valve stems nuts and the service port cap.
Be sure to use a torque wrench to tighten the service port cap to a torque 18N
·
m.
Be sure to check the gas leakage.
3. Adding the refrigerant if the pipe length >5m
Procedure:
1). Connect the charge hose to the charging cylinder, open the 2-way valve and the 3-way valve.
Connect the charge hose which you disconnected from the vacuum pump to the valve at the bottom of
Содержание KAY-26 DN7
Страница 1: ...PRODIGY 3D Inverter Technical Manual...
Страница 11: ...PRODIGY Technical Manual 11 For KAY 26 DN7...
Страница 12: ...PRODIGY Technical Manual 12 For KAY 35 DN7 For KAY 52 DN7...
Страница 13: ...PRODIGY Technical Manual 13 For KAY 71 DN7...
Страница 14: ...PRODIGY Technical Manual 14 3 2 Outdoor Unit...
Страница 15: ...PRODIGY Technical Manual 15 For KAE 26 DN7...
Страница 16: ...PRODIGY Technical Manual 16 For KAE 35 DN7 KAE 52 DN7...
Страница 17: ...PRODIGY Technical Manual 17 For KAE 71 DN7...
Страница 64: ......