background image

Содержание asurion uBreakiFix Fixture

Страница 1: ... Wall Tech Bench Cleaning Maintenance Guides Warranty Manufacturer Contact Information Replacement Cabinet Lock Key TOOLS REQUIRED TABLE OF CONTENTS Cordless Drill 1 8 Drill Bit 1 2 Drill Bit Optional 1 2 Paddle Bit Phillips Driver Bit Tape Measure Level Pencil Flathead Screwdriver Phillips Screwdriver 7 16 Wrench 7 16 Socket 5mm Allen 4mm Allen ...

Страница 2: ...ent the damage with Katalyst If we prepaid the freight with the carrier we will begin the concealed damage claim Concealed damage claims must be reported to Katalyst within 7 calendar days Remember at this point you signed the BOL free and clear or possibly subject to count and inspection so the sooner you can inspect the goods and report any concealed damage the better the chances of collecting o...

Страница 3: ... the photos to your Katalyst contact person via email Call Katalyst immediately preferably with the driver still present Keep a copy of the BOL noting the damage with the driver s signature Keep all crating and packaging material with the damaged item s for inspection by the company s claim inspector until told by Katalyst or the carrier to return or dispose of the item s Claims not reported withi...

Страница 4: ...top Drawer Assembly Metabox Drop in Power Trough Black Box HARDWARE PROVIDED A Workbench Small Cabinet to Tall Cabinet B Cabinets to Toe Kick C Shelf Pins D Steel Legs to Cross Member E Cross Members to Horizontal Steel F Horizontal Steel Beam to Tall Cabinet Black Nut Goes Inside Cabinet G Steel Legs to Drawer Cabinet H Metabox Cabinet to Tall Cabinet I Cabinet to Countertop J Steel Black Box to ...

Страница 5: ...the toe kick and align with the access openings STEP 3 Set the taller cabinet onto the other half of the toe kick and align the holes to connect the cabinets together Use a male female furniture bolts A to connect STEP 4 Verify alignment of the cabinet units on the toe kick Then use wood screws B in the pre drilled holes to attach to the toe kick below STEP 5 Insert adjustable shelves C access pan...

Страница 6: ... long cross member onto the tall cabinet using the provided hardware F Adjust the leveling feet in the base of the legs until level STEP 1 Carefully lift and set the drawer unit onto the metal leg assembly and the ledge of the tall cabinet STEP 2 Remove all drawers for access to bolt holes STEP 3 Attach the table legs to the drawer unit using the provided hardware G STEP 4 Align the table leg hole...

Страница 7: ...STEP 3 Insert the drop in power trough and secure to countertop with provided screws J STEP 4 Run power into the power trough for easy access to phone chargers STEP 5 Cash drawer comes pre installed Use the access hole to connect for wiring STEP 6 Install the receipt label printer on the pull out shelf in the rear cabinet on the right The door height is lowered to allow easy access to those items ...

Страница 8: ...Wall Frames 1 4 x 4 K Wall Frame Cabinet 3 Header Boxes 2 End Panels 6 Furring Strips 12 C Channel 3 Bottom Wall Panels 15 Slat Wall Panels HARDWARE PROVIDED A System Screws B 7 Frame to 7 Frame C Standoff Bolts D Tech Gallery Anchors E Cabinet to 4 Frame F Frame to Side Panel G Header to Side Panels Bolt Only H Header to Header Bolt Nut I Header Bolts J Shelf Pins ...

Страница 9: ...facing the down towards the floor STEP 3 Hand screw the leveling feet into the bottom of the K Wall frames until snug 2 per 4 segment STEP 5 Ensuring the edges of frames are flush add a washer onto the frame connection bolts and insert the bolt through the top hole between the frames Once through use a wrench to hold the bolt and secure with a second washer and wing nut B STEP 6 Repeat step 5 with...

Страница 10: ...htly pressing against the c channel STEP 8 Put the furring strip with the c channels into the mounting channel on the K Wall frames STEP 9 Insert the second bolt into the K wall mounting channel and hand tighten to secure STEP 10 Repeat steps 7 9 for the smaller 4 tall K Wall frame INSTALL FURRING STRIPS 2 Furring Strips Per 4 segment ...

Страница 11: ... STEP 14 Once all Snap Toggle anchors are securely fastened in the wall realign the wall frames and use wall connection bolts and a washer to secure the furring strips to the wall STEP 15 Adjust leveling feet using a flat head screwdriver until wall is level and all feet are against the floor NOTES FOR OTHER WALL TYPES If installing on walls without standard gypsum installation use specialty wall ...

Страница 12: ... the provided hardware STEP 19 Locate the wood end panels Referencing the up arrow drop the system screws into the keyhole slots and then use bolts to fasten F STEP 20 Set the header cubbies onto the header flags and then secure to each other and the adjacent end panels with provided hardware G H Fasten securely onto the header flags with the smaller bolts I STEP 21 To install the decorative signa...

Страница 13: ...s is the bottom panel Hang this panel first by sliding the system screws into the keyhole slots STEP 23 Starting with the side that will have the large panel poster frame TV hang the remaining panels working your way up from the bottom Before beginning the next column plug in electronics as required HANG THE WALL PANELS ...

Страница 14: ...tach overhead wall support to the top corner of the wall structure using supplied brackets and site specified wall anchor s STEP 4 Glaze the wall with supplied glass and trim with supplied rubber glazing Additional instructions provided page 16 17 INSTALL HARDWARE NOTES Assemble glass divider wall using experienced installers aware of all local state and federal building and structural codes All fa...

Страница 15: ...and insert them in the templated spot beginning with the two letter i s using the secondary template to locate the dot above the i STEP 9 Use a dry erase marker or piece of tape to mark the bottom right corner of the uBreakiFix template then align the by Asurion sign template with this corner The n in Asurion should align with the right edge of the x in uBreakiFix Additional Instructions provided ...

Страница 16: ......

Страница 17: ......

Страница 18: ...fely install Use an adhesive such as Epoxy that will bond with the letters mounting surface 3 INSTALL Letters Using Guide Remove masking from VHB tape and install letters on wall using your guide Do NOT press hard on letters yet lightly set letters on wall View letters from a distance to make sure they are visually straight adjust and align as needed 4 PRESS Letters to Set After letters are aligne...

Страница 19: ...THIS PAGE INTENTIONALLY LEFT BLANK ...

Страница 20: ... Unistrut Rails Portrait TV Shroud Box Frame Landscape TV Shroud Single or Double Messaging Kit COMING SOON TV s TV Brackets HARDWARE PROVIDED A Unistrut Mounting Hardware B Unistrut Nuts C Metal T to Unistrut Nut D Box Frames to Unitstrut Nut E TV Mounting Bracket Hardware Two Different Sizes ...

Страница 21: ...ls and install Easy Toggl Anchors A per instructions below MOUNTING THE SUPPORT FRAMES STEP 3 Use a the provided hardware A to secure the frames to the wall STEP 4 Verify distance between rail by attaching Unistrut Nuts B C to the T brackets and sliding onto the Unistrut track as shown the the adjacent image STEP 5 Attach the Unistrut nuts B D loosely to the Box Frames portrait and landscape then ...

Страница 22: ...on the side The brackets should be 10 apart STEP 7 Tighten all connections with Box Frames and T brackets Verify electrical placements and run wiring as needed STEP 8 Attach TV brackets onto the rear of the TV noting the different bolt sizes and spacers Note the left and right brackets For the portrait TV align the bracket so the slots are facing the power access on the TV MOUNTING THE RED PANELS ...

Страница 23: ...efully lift the TV with brackets attach and set over the Notch in the T Brackets Once set the TV can tip out slightly for maintence and cable connections STEP 10 Install sign messaging package COMING SOON STEP 11 Cut and install Unistrut track cover as needed ...

Страница 24: ...s STEP 1 Layout the table base components STEP 2 Thread the metal rod through the base pipe and into the T leg STEP 3 Use a wrench to secure the nut onto the end of the metal rod STEP 4 Use provided hardware to fasten the legs onto the worksurface top STEP 5 Install black power grommets and move into place ...

Страница 25: ...ct adhesive used during fabrication Clean with a non abrasive cotton cloth and an adhesive solvent such as Formica Brand Non flammable Contact Adhesive Solvent Use solvent sparingly as excessive amounts may delaminate edges Read and follow all warnings and instructions on the labels of all solvent products STAINS To remove or minimize stains use full strength Fantastik All Purpose Cleaner Formula ...

Страница 26: ...omponents will be repaired or replaced by us during this period without charge and within a reasonable time frame as determined by us Katalyst Group Inc is not responsible for repairs or work by others to items produced by us during this warranty period where reasonable notice and opportunity to repair was not provided nor is Katalyst Group Inc responsible for normal wear and tear REPLACEMENT CABI...

Страница 27: ... 816 221 0121 W katalyst group UBIF PROJECT MANAGERS Jason Nelson jasonn katgroupinc com Alexis Kiel alexis katgroupinc com CONSTRUCTION PROJECT MANAGERS Alexis Kiel alexis katgroupinc com FINANCE ACCOUNTING Katie Fisher office katgroupinc com SHIPPING RECEIVING Lacey Pacheco lacey katgroupinc com ...

Страница 28: ...Short Cabinet Workbench Drawer Assembly Workbench Co mm un ity Wa ll Bo x Fra me s ...

Страница 29: ...Glass Panels K Wall Frames K Wall Frames Drawer Assembly Workbench Tech Gallery Panels ...

Страница 30: ...Co mm un ity Wa ll Bo x Fra me s Tech Gallery Panels ...

Страница 31: ...uBreakiFix Fixture Install Maintenance Guide 31 ...

Страница 32: ... tabs on either side of the box The graphic should lie flat against the wall panels STEP 5 Remove the rubber feet from the Care Sanitizer to expose the screw holes underneath STEP 6 Using the provided screws secure the Care Sanitizer onto the display bracket STEP 1 STEP 2 STEP 3 4 STEP 5 STEP 6 OPTIONAL POWER To run power to the Care Sanitizer remove the panel below the display Prior to the grahpi...

Страница 33: ... tabs on either side of the box The graphic should lie flat against the wall panels STEP 5 Remove the rubber feet from the Care Sanitizer to expose the screw holes underneath STEP 6 Using the provided screws secure the Care Sanitizer onto the display bracket STEP 1 STEP 2 STEP 3 4 STEP 5 STEP 6 OPTIONAL POWER To run power to the Care Sanitizer after step 2 drill a 1 2 hole located in the notch in ...

Отзывы: