29
Tower removal process
Removal of the tower allows access to the solution tank cover/gasket, the strainer assembly and outlet hose from the tank to the
strainer. The Steering shaft removal process needs to be performed in order to remove the tower assembly (see instructions on
pages 23-28.
Using the T-20 Torx driver remove the 5 screws towards
the front of the tower.
Lay the machine on it’s side and remove the 10
screws from the bottom of the tank.
Remove the 4 screws holding the axel/
wheel assembly.
Remove the screws from the wheel wells (2 on each side).
Содержание ARMADA BRC 40/22 C
Страница 1: ...1 ARMADA BRC 40 22 C...
Страница 5: ...5 Technical Specifications...
Страница 6: ...6 Product Overview...
Страница 7: ...7...
Страница 33: ...33 To remove the power supply from the controller assembly squeeze the 4 standoffs to release them...
Страница 38: ...38 Electrical schematic...
Страница 39: ...39 Wire color code...
Страница 43: ...43 Solution system flow...
Страница 52: ...52 Figure 1g Figure 2g...
Страница 57: ...57...
Страница 58: ...58...
Страница 59: ...59...
Страница 61: ...61 New material to strengthen the vac shoe mount...