JUNCTION & ALU RAIL EXTREMITY
Ref. PN 8000 & PN 9000
Step 02 : Junction: Ref. PN 5000 (08)
Join two lengths of Alurail intermediate. Match the sections of both the
Alu. Rail. Place the junction plate on either side of the Alu. Rail with the
holes of junction plate matching with those of Alu. Rail intermediate.
Fix both the plates by 4 sets of fasteners.
Ensure that the gap between the two rails is not greater than 1.5 mm.
24
Step 01 : Installation of Alu Rail Extremity PN 5000 (02)
ALU RAIL EXTENSION & TROLLEY
Ref. PN 8000 & PN 9000
Step 4: Vertical Trolley: Ref. PN 8000(01)
*
Insert the trolley in the Alu. Rail extremity. Press the termination of
the extremity and pass the trolley over the termination.
*
After the trolley slides on the Alu. Rail the termination cones back to
its original position ensuring that the trolley does not slide off the
Alu. Rail.
SAFETY LOCKING PIN
L - CLAMP
LOCKING JIB
L - CLAMP
LOCKING JIB
25
Step 3: Installation of Alu Rail Extension PN (8000 (03))
*
Repeat step 3 to join the Alu rail Extension with the Alu Rail
Intermediate.
*
Select the correct Alu Rail Extension Support depending upon the
type of roof
*
Connect the Alu rail Extension support to the end of the Alurail
Extension using a mounting nut.
*
For trapezoidal roof sheets use blind rivits to install the Alurail
Extension support to the roof,for standing seam fasten the bracket
using nut bolts