
8
Kamstrup A/S • 55123307_A1_EN-US_06.2022
Installation guide flowIQ® 4200
4.3 Split flange installation
Installation sketch:
Installing a meter with split flanges gives the option to install the flanges on the pipeline
systems first or on the meter itself. Best practice depends on the installation scenarios
and the space conditions.
Both options are described below and both installation options require the same
procedure for tightening the flange bolts in the described criss-cross pattern.
Tighten all flange bolts according to the described criss-cross pattern with the correct
tightening torque. Repeat this procedure three times in total to ensure correct meter
installation.
Note!
Criss-cross pattern to be repeated three times.