
VertiCool
Assembly instructions
6
5
Pre-commissioning checks
Check before initial commissioning whether all necessary conditions have been met so that the
unit can function safely and properly.
Structural tests
Check that the unit is securely standing and fixed.
Check the horizontal installation/suspension of the unit.
Check whether all components are properly fitted.
Check whether all dirt, such as packaging or site dirt, has been removed.
Air-side checks
Check whether there is unimpeded flow at the air inlet and outlet.
6
Maintenance
6.1
Clean the inside of the unit
Check all elements that come into contact with air (internal surfaces of the unit, outlet elements
etc.) for dirt or deposits during maintenance and use a commercially available product to re-
move.
Содержание VertiCool
Страница 21: ...VertiCool 21 5 6 6 1...
Страница 22: ...22 1 2 3 4 5 6...
Страница 23: ...23 7 8 9 10 11 12...
Страница 24: ...24 13 14 15 16 17 18...
Страница 25: ...25 19 20 21 22 23...
Страница 26: ...26...
Страница 27: ...27...
Страница 28: ...28...