Venkon XL
Beschreibung
Assembly, installation and operating instructions
57
1
2
Fig. 55: Filter positions
1 ISO Coarse dry later
filter
2 ISO ePM10>50%
cassette filter
The ISO ePM10>50% cassette filter is replaced in the same way as the ISO
Coarse dry layer filter.
10.3.3 Cleaning the condensate tray
before cleaning the condensation tray. Steps 1 – 3 are only necessary if a condensa-
tion pump has been fitted (optional accessory).
Fig. 56: Loosening the cable ties
Pinch off the cable ties.
Fig. 57: Loosening the wire tensioning clamp
Loosen the wire tensioning clamp on the drain connector of the condensation
tray.
Содержание Venkon XL
Страница 2: ......
Страница 5: ...5 13 2 ERP Datenblatt Venkon XL 70...
Страница 67: ...Venkon XL Beschreibung Assembly installation and operating instructions 67 13 Certificates...
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ...www kampmanngroup com hvac products fan coils venkon xl 02 20 ENSAP Nr 1374732...