Ultra
Assembly instructions
5
safety and accident prevention regulations
country-specific guidelines and recognised technical regulations, i.e. Association of German
Electricians (VDE) regulations, DIN and EN standards
VDI 6022; Maintenance personnel must be trained to Category B (possibly Category C) to
comply with hygiene requirements (as required)
2.5
Personal Protective Equipment
Personal protective equipment is used to protect people from impaired safety and health when
working with the unit. The applicable accident prevention regulations at the place of use apply
in all cases.
3
Transport, storage and packaging
3.1
General transport instructions
Check on delivery for completeness and transport damage.
Proceed as follows in the event of visible damage:
Do not accept delivery or only accept with reservations.
Record any transport damage on the transportation documents or on the transport company's
delivery note.
Submit a complaint to the freight forwarder.
IMPORTANT NOTE!
Warranty claims can only be made within the applicable period for complaints.
(More information is available in the
IMPORTANT NOTE!
2 people are needed to transport the unit. Wear personal protective clothing
when transporting the unit. Only lift the unit on both sides and not by the pipes /
valves.
IMPORTANT NOTE!
Material damage caused by incorrect transport!
Units being transported can drop or topple over if transported wrongly. This can
cause serious material damage.
Proceed carefully when unloading the equipment on delivery and when
transporting it on site and note the symbols and instructions on the pack-
aging.
Only use the holding points provided.
Only remove packaging shortly before assembling the unit.
4
Installation and wiring
4.1
Requirements governing the installation site
Only install and assemble the unit if the following conditions are met:
Make sure that the wall/ceiling is sufficiently load-bearing to take the weight of the unit.
Make sure that the unit is securely suspended/standing.
Ensure that the airflow can circulate freely.
Provide for adequate space for floor and return water connections on site.
There is a power supply on site.
If need be, provide a condensation connection with a sufficient gradient on site.
4.2
Installation height and throws
When suspending the units, pay attention to the maximum installation heights and throws!
Make sure that the units are suspended vibration-free (using rubber vibration elements if neces-
sary).
W
H
Maximum installation heights and throws
Type series
Voltage [V]
Speed [rpm]
Max. installation
height H [m]
Throw W[m]
73_ _58
10
940
2,5
4,3
8
795
2,4
3,9
6
650
2,4
3,5
4
505
2,3
3,1
2
365
2,3
2,7
84_ _58
10
1070
2,9
4,8
8
950
2,7
4,4
6
730
2,4
3,4
4
490
2,4
2,4
2
280
2,3
1,5
85_ _58
10
1000
3,4
5,6
8
890
3,2
5,2
6
700
3,0
4,6
4
480
2,7
3,9
2
260
2,4
3,1
96_ _56
10
680
3,6
5,7
8
550
3,4
5,1
6
410
3,2
4,4
4
270
3,0
3,8
2
100
2,7
3,0
96_ _58
10
1000
4,1
7,2
8
800
3,8
6,2
6
580
3,5
5,2
4
370
3,2
4,2
2
170
2,8
3,3
4.3
Installation
2 people are needed to install the unit.
CAUTION!
Risk of injury from sharp metal housing!
The inner metal of the casing can have sharp edges.
Wear suitable protective gloves.
IMPORTANT NOTE!
Horizontal installation of units!
When installing the units, ensure that they are completely horizontal to ensure
proper operation.
Содержание Ultra
Страница 23: ...Ultra 23 2 3 2 4 VDE DIN EN VDI 6022 B C 2 5 3 3 1 Kampmann 2 4 4 1...
Страница 25: ...Ultra 25 5 EC DIP...
Страница 26: ...26 1 2 2 2 2 1 2 1 1 6 5 4 3 1 6 5 1...
Страница 27: ...27 2 3...
Страница 28: ...28...