2. Install the Valve
CAUTION: Risk of product damage.
This valve contains
plastic and rubber components. Do not sweat or braze
directly to the valve body. Do not apply excessive heat to the
valve body when you make solder connections. Do not apply
flux or acids directly to the valve or you may damage the
seals and plastic components.
CAUTION: Risk of product damage.
Do not apply
petroleum-based lubricants to the valve components or
damage may result.
CAUTION: Risk of product damage.
Inlet and outlet
threaded joint connections should be made with plumbers
PTFE tape or liquid sealant. Oil-based, non-setting
compounds should not be used.
NOTE:
A plaster guard is attached to the face of the mixing valve
with two screws. Do not remove it until instructed.
NOTE:
A plaster guard is attached to the face of the mixing valve.
Do not remove it until instructed.
Flush the hot and cold water supply lines to remove any debris.
Install water hammer arrestors in the hot and cold water supply
lines.
Hot Water
Supply Line
Cold Water
Supply Line
Plaster
Guard
Finished
Wall
If less than
3/16" (5 mm),
backing is
required.
Backing 1/2"
Plywood (Optional)
2-7/16"
(6.2 cm)
2-3/4" (7 cm)
Kallista
9
1048326-2-B