17
2. Remove the LPG jet from the elbow shaped brass injector assembly.
Connect the QDD to the Natural gas supply, then connect the grey hose to QDD
LEAK TESTING MUST BE DONE ON THE APPLIANCE AFTER CONVERSION PRIOR TO
PLACING IT INTO OPERATION. PLEASE FOLLOW “ LEAK TESTING” IN THIS MANUAL
TO CONDUCT LEAK TESTING
PLACKING THE MARKING PROVIDED IN THE CONVERSION KIT IN THE CONTROL
PANEL AFTER CONVERSION.