
C: It has a long hydraulic cylinder for clamping, you can tighten the vise by the vise
clamping handle, as picture 7.
5.2 Coolant system
Our band saw has a built-in coolant system that extends the life of your band saw blades by
lowering the temperature of the blade and workpiece.
(1) Access the reservoir by removing the front panel.
(2) Thoroughly clean and remove any foreign material that may have fallen inside the
reservoir during shipping.
(3) Fill the reservoir with your choosen cutting fluid solution and replace the front panel.
(4) Adjust the valves on the coolant hoses to control the flow of coolant (see picture 8).
Make sure that the pressure is not so high that coolant spills on the floor and creates a
slipping hazard.
Figure 7
long hydraulic cylinder
vise clamping handle
Figure 8
Coolant control
valve
Содержание TGK-08
Страница 1: ...METAL CUTTING BAND SAW MODEL TGK 08 TGK 4220 TGK 14 TGK 4235 TGK 16 TGK 4240 Operation manual...
Страница 25: ...9 Electrical drawing breakdown part list 9 1 Electric drawing TGK4220...
Страница 26: ......
Страница 27: ...9 1 Breakdown TGK4220...
Страница 28: ......
Страница 32: ...9 2 Electric drawing TGK 4235 TGK 4240...
Страница 33: ......
Страница 34: ...9 2 Breakdown TGK4235...
Страница 35: ......
Страница 39: ...9 3 Breakdown TGK4240...
Страница 40: ......
Страница 41: ......