high-lift pallet truck
4
Subject to change without notice
Service people:
Read carefully the instructions of use and maintenance, given by the company
manufacturing the battery.
Maintenance of the battery:
Be sure pole terminals and cable lug of battery are clean and covered slightly
with grease and tightened.
Do not retain discharged batteries. Recharge as soon as possible.
Avoid heavy discharge of more than 80% of nominal capacity.
Disposal of the battery:
Please follow carefully national laws and recommendations concerning protection of
environment of your country. Also follow battery manufacturer recommendations
on this purpose.
Battery loading
Battery should be loaded as soon as lifting speed is slowing down, and/or
green diode is dark. The loading is starting automatically, the red
diode is on. The loading is finished when 8 to 10 diodes (including the red diode) of
the discharge indicator is on. When loading is done the green pilot lamp is on. The
electric high-lift pallet truck can be taken into operation again.
The loading time is about 10 to 12 hours while the machine cannot be used.
Never leave the built-in charger longer than 24 hours connected. Never
discharge the battery totally (max. discharge 80%), this could damage the
battery or even render it useless.
VII. Inspection and maintenance instructions
Safety warning
Before inspection and maintenance work is carried out, appropriate measures
should be taken to remove all loads from the electric high-lift pallet truck.
Maintenance and inspection work
Inspection intervals
Check operating elements for faultless operation.
daily or each time
before use
Check condition of the travelling rollers and roller axles
Grease joints and bearings
monthly
Check functioning of wheels and rollers
Check hydraulic system for leakage (Is the top lifting height
reached effortlessly?)
every 3 months
Check the set-up of the drain valve
Check all screw and bolt connections for tightness
Содержание QUIPO QUICK-LIFT ESGH 1000 I
Страница 56: ......
Страница 129: ...RUS I 1 2 3 4 5 6...
Страница 130: ...7 8 9 10 11 12 II 49 3 1 2 3 36 36 104...
Страница 131: ...III ISO VG32 1 5 3 5 IV 400 V 2 2 VI Picture 3 Add Hydraulic Oil...
Страница 132: ...VII 12 70 AC 220 DC 12 8 80 8 10 10 12 24 80...
Страница 133: ...VIII 300 3 IX ISO VG 46 ARAL Aralub 2 BP Mehrzweckfett L2 Energrease LS 2 ESSO Beacon 2 6...
Страница 134: ...5 C 45 C L HL 68 ISO VG68 15 C 5 C L HL 46 ISO VG46 X KM KM...
Страница 135: ...XI...
Страница 181: ...Elektrikli makas atall kald rma arabas nceden haber vermeksizin de i iklik yapma hakk sakl tutulmaktad r Sayfa 1 5...
Страница 182: ...Elektrikli makas atall kald rma arabas nceden haber vermeksizin de i iklik yapma hakk sakl tutulmaktad r Sayfa 1 5...