F
ÜGEN SIE HIER
I
HR
F
IRMENLOGO EIN
!
I
NBETRIEBNAHME
Before connecting with electric power, a electrician should check that your CEC-plug and socket 5 poles
(high power electric socket)
All 3 phases having power (400 V / 50 Hz) and the rotary field is right side (as per
DIN)
In case one phase has no electric power the grinding, motor of the SSG will be destroyed. (the winding will
burn out). In this case, we will not replace under warranty.
After checking successfully the CEC plug and socket 5 poles, connect the machine with electric current.
Next connect with air pressure (only for SSG 600 automatic), therefore use the supplied maintenance unit
and adjust the operation pressure to 5 – 5,5 bar. (In this range, the machine works at it’s best.) The air
consumption is approx. L/min.
9
Содержание SSG 600 A-DC
Страница 17: ...KAINDL SCHLEIFTECHNIK MASCHINENZEICHNUNGEN Drawings of machine Picture 1 17...
Страница 18: ...KAINDL SCHLEIFTECHNIK MASCHINENZEICHNUNGEN Picture 2 18...
Страница 19: ...KAINDL SCHLEIFTECHNIK MASCHINENZEICHNUNGEN KAINDL SCHLEIFTECHNIK MASCHINENZEICHNUNGEN 19 Picture 3 19...
Страница 20: ...KAINDL SCHLEIFTECHNIK MASCHINENZEICHNUNGEN Picture 4 20...
Страница 21: ...KAINDL SCHLEIFTECHNIK MASCHINENZEICHNUNGEN Picture 6 Cleaning stone 22...
Страница 22: ...KAINDL SCHLEIFTECHNIK MASCHINENZEICHNUNGEN Picture 9 23...
Страница 27: ......
Страница 28: ......