5.
SET UP AND CONNECTION
OF THE CONTROL UNIT
5
Before placing the machine at its final position on the floor, screw in the machine feet
from below. Please pay attention that the machine is alignment horizontal. Please check
with a bubble level. Pay attention, that the space for the machine grants a vibration free
operation.
Next to connect the control unit with the machine, therefore open the black cable panel
on the right side of the machine.
For operating, unscrew the both screws below (M6) with a allen key (4 mm) and fold the
cable panel cover upwards.
Now you can pull through the cables with the plugs and fix the cable conduit by closing
the panal. By fixing the both screws the cable conduit is fixed tight and strain relieved.
After opening the front door, the plug connection is completed (see below).
The plug-in connectors are without risk of confusion
Cable panel
Only unscrew these both screws
to open the cable panel
Fitting ready