![KAESER SM 8 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/kaeser/sm-8/sm-8_service-manual_3214701005.webp)
Technical Specification
1 --- 2
Maximum dual element time -- delay fuses are selected according to
1996 N.E.C. Article 240 -- 6, 430 -- 52 and Tables 430 -- 148 & 150.
Select multi-- strand copper core wire at 40
C ambient temperature
according to 1996 N.E.C. 110 -- 14(c), 220 -- 3, 310 -- 15, Table 310 -- 16,
430 -- 6, 430 -- 22 and Tables 430 -- 148 & 150.
For electrical power supply please refer to chapter 2.3 and 6.3
1.5
Set Point of the Safety Relief Valve
110 psig Compressor Unit --- Activating pressure
140 psig
. . . . . . . .
125 psig Compressor Unit --- Activating pressure
155 psig
. . . . . . . .
145 psig Compressor Unit --- Activating pressure
175 psig
. . . . . . . .
190 psig Compressor Unit --- Activating pressure
230 psig
. . . . . . . .
1.6
Installation Requirements
Max. height above sea level of the place of installation
3000 ft.
. .
(for all heights above please contact authorized KAESER distributor)
Min. ambient temperature
40
E
F
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Max. ambient temperature
105
E
F
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Min. cooling air/inlet air temperature
40
E
F
. . . . . . . . . . . . . . . . . . . .
Max. cooling air/inlet air temperature
105
E
F
. . . . . . . . . . . . . . . . . . .
Air inlet opening
2.2 sq.ft.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Exhaust air for solution A (see chapter 6.1):
Forced ventilation with exhaust ventilator
1470 cfm at static pressure of
. . . . . . . . . . . . . .
0.4 inches water column
Exhaust air for solution B (see chapter 6.1):
Exhaust air used for space heating:
Heating duct w x h
7 3/4” x 14”
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.7
Oil Capacities
Total oil capacities
1.3 gal
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
After oil change or after long period of storage
Quantity required for prelubrication of the airend
0.1 quart
. . . . . . . . .
(Refer to chapter 7.7.1)
Attention!
Содержание SM 8
Страница 9: ...Technical Specification 1 6...
Страница 16: ...Construction and Operation 5 13...
Страница 17: ...Construction and Operation 5 14...
Страница 54: ...Appendix 11 51 11 Appendix 11 1 Wiring Diagram...
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 74: ...SM 8 SM 11 A 08 B 07 C 14 D 11...
Страница 76: ......
Страница 78: ......
Страница 80: ......
Страница 82: ......