Application note -
Grid standby operation for blueplanet hybrid 10.0 TL3
APL_ Grid_Standby_Operation_for_
blueplanet hybrid 10.0 TL3
Status: 2022-08-08
Page 7 of 8
6
Installation verification for standby power operation
Product description
blueplanet hybrid 10.0 TL3
blueplanet hy-switch
I/We confirm that the devices listed above have been properly installed in compliance with the manufacturer's
instructions and the respective laws and standards valid on the installation date, in particular:
Automatic circuit breaker with 20 A (4-pole) in unit supply line.
Installation of an RCD type B (30 mA) is required for standby power operation.
The protective earthing must be functional even if the public grid is disconnected.
The shielding of the communication cable between the device and the
blueplanet hy-switch
must be disconnected
on the
blueplanet hy-switch
side.
Reference to generating device with automatic start-up in house distribution
System operator:
Name
First name
Company
Street address
Country / Postcode
City
System site: (if different)
Street address
Country / Postcode
City
Serial numbers / installation date:
Serial numbers blueplanet hybrid 10.0 TL3
Installation date / commissioning
Serial numbers blueplanet hy-switch
Installation date / commissioning
Installer:
Company
Authorised representative (first name/last name)
Street address
Country / Postcode
Telephone
City
Date
Signature
Company stamp