background image

Use r ma nual Ka bola B-serie, 1-4-2005 

12

 

4.2 

Starting your system 

 

When everything is connected follow procedure below: 
1. 

Connect the boiler to the power supply, the earthed outlet for the 230V AC version and the 

 

battery for the 24 V DC version. 

2. 

Switch the boiler on with the on/off switch on the dashboard.  The lamp in the switch will 

 

indicate that the system is active.  This lamp is not present in the 24 V DC version. 

3. 

Set the required boiler temperature between 55 and 90°C using the boiler thermostat. 

4. 

Set the room thermostat so that it is switched on.  (See manual of the room thermostat) 

5. 

Start the oil burner (figure 11) 

 

5.1 

Open the valve of the fuel tank (5) 

 

5.2 

Open the valve on the oil filter (5A) 

 

5.3 

Install the bleeding hose (3C) on the bleeding opening of the filter 

 

5.4 

Start the oil burner. 

 

5.5 

The burner switches on, when the burner is fitted with a pre-heating element, this will 

 

 

take 1,5 minutes. 

 

5.6 

Open the bleeding valve on the oil filter. 

 

5.7 

Check if oil is coming out of the hose. 

 

5.8 

Check all oil connections for leakage’s. 

 

 

5.8.1 

W hen the burner won’t start, the control light (8) will light. 

 

 

5.8.2 

close the bleeding valve (3B) on the filter. 

 

 

5.8.3 

W ait approximately 3 minutes. 

 

 

5.8.4 

reset the burner by pushing button (8) and return to 5.4 (repeat if necessary) 

 

5.9 

Close the bleeding (3B) when only oil and no bubbles come out of the hose. 

 

Atte ntion:  

The oil burner is tested by the manufacturer, not adjusted.  The adjustment of the burner has 

to be done by an experienced installer, because this requires expert knowledge.  To be eligible for 
warranty, the boiler has to be adjusted by an approved installer.  Contact Kabola Heating Systems or 
your importer to make an appointment. 

Never adjust the  burner using your own initiative . 
 

A correctly adjusted burner shows a clear white flame, which is visible through the inspection opening (6) 
 

Operating the boiler 

 

When the boiler has been started and adjusted according to 4.2, operation of the boiler is very simple.  
The required temperature is set with the room thermostat, which regulates the boiler.  The operation of 
the thermostat is explained in the manual of the room thermostat. 
 
If problems arise with the operation of the boiler, you will find a list of possible problems and solutions in 
Appendix D. 

 

Cleaning and maintenance 

 

6.1 

Points of attention 

 

Spare parts must be ordered through your importer dealer or from Kabola Heating Systems.  For 
warranty purposes only original spare parts may be used.  When ordering spare parts, mention the type 
of the boiler and its serial number.  Kabola Heating Systems will then be able to deliver the correct parts.  
In Appendix B, the main spare parts are listed. 
 

Содержание B-8

Страница 1: ......

Страница 2: ...ay Hint This gives the user suggestions and advises to facilitate the execution of certain tasks Attention Additional information is supplied to the user and possible problems are indicated Warning Wa...

Страница 3: ...al heating system 7 4 1 3 Flue gas outlet 7 4 1 4 Electrical installation 8 4 1 5 Filling the central heating system 9 4 1 6 Mounting the burner 10 4 1 7 Connecting the oil filter and oil burner 11 4...

Страница 4: ...ation These boilers are not designed for direct heating of the rooms in which they are installed 1 3 Product description The B Series boilers heat the central heating water by means of a pressure jet...

Страница 5: ...be complied with when operating the B Series boilers Measures for a safe installation Don t store any flammable and or gaseous products in the room where the boiler is installed to avoid explosions a...

Страница 6: ...burner Store the boiler standing up Store the boiler on a firm horizontal base 4 Installing and preparing for first use In this chapter you will find directions and hints for a correct placement and f...

Страница 7: ...arts where contact with human body parts is possible For a correct flue gas outlet the following points need to be observed Use the proper length diameter dimensions use a diameter equal to the diamet...

Страница 8: ...5 elbows of 90 The maximum allowed length is 10 metres Every elbow of 90 counts as 1 metre Outside use double walled chimney pipe Hint To reduce the noise resulting from flames it is wise to install...

Страница 9: ...res to points 5 and 6 of the connector should conform to the values in table 1 Table 1 Distance to the battery Core diameter 6 metres 6 mm 15 metres 10 mm 4 1 5 Filling the central heating system The...

Страница 10: ...a B12 you need to saw an extra piece off the flange The mounting of the burner is done in the following way 1 Place the nut for the flange bolt in the dedicated position and place the gasket 2 Mount...

Страница 11: ...nnect the fuel line from the tank to the filter 5A The fuel line must have a outer diameter of 8mm and must be made from copper or steel The fuel has to be connected directly to the oil tank Correct f...

Страница 12: ...button 8 and return to 5 4 repeat if necessary 5 9 Close the bleeding 3B when only oil and no bubbles come out of the hose Attention The oil burner is tested by the manufacturer not adjusted The adjus...

Страница 13: ...pes with a thin metal strip Attention Don t use any aggressive solvents like thinner or gasoline 1 9 Clean the boiler with a vacuum cleaner 1 10 Replace the boiler top if necessary use a new gasket 1...

Страница 14: ...ection 1 1 1 5 4 1 1 2 2 2 2 IP value 50 11 Burner 230 V 24 V 2 B009 3 C012 2 B010 3 C013 2 B011 3 C014 2 B012 3 C015 2 B013 3 C016 2 B014 3 C017 2 B014 2 B016 2 B017 Nozzle 60 0 30 0 40 0 50 0 85 1 0...

Страница 15: ...ation pump 13 Seal Two 1 or bigger 14 Knee inner x outer thread Different per type 1x1 1 x1 or 1 x1 15 Pressure valve pressure gauge fill drain cock 16 T connection 1 x x1 Only for B 12 17 Fire inspec...

Страница 16: ...User manual Kabola B serie 1 4 2005 16 Appendix C Electrical diagram B8 B70 230V...

Страница 17: ...User manual Kabola B serie 1 4 2005 17 Appendix D Electrical diagram B80 B100 230V...

Страница 18: ...User manual Kabola B serie 1 4 2005 18 Appendix E Electrical diagram B8 B45 24V...

Страница 19: ...f flame protection Flame protection defect photo cell Replace flame protection Burner starts pulsing Flue glass flow interrupted Clear chimney opening Boiler dirty Clean boiler Oil supply interrupted...

Страница 20: ...User manual Kabola B serie 1 4 2005 20 Appendix G CE declaration...

Отзывы: